- HOME
- List of Articles
- On-Site Spray-Applied Formwork
The raised portion of the sheet pile frame is treated as natural ground | Basis for Calculating Drilling Length
Hello, everyone. This is Enta. Things have been pretty hectic lately. And that leads to a vicious cycle where my blog posts get delayed. I’m really sorry about that. I’ll do my best to post a little sooner from now on! But anyway… The drilling depth for rock bolts is 3.0 meters.…
The Secrets of Formwork Removal (2017 Edition) | Collaboration Between Slope Contractors and Anchor Contractors
Hello, everyone. This is Enta. It’s December—the busiest month of the year. Or is it starting tomorrow? Anyway, accidents tend to increase during December. Even though rushing doesn’t change anything, we still end up rushing. Let’s take it slow, especially during December! But enough of that. Let’s talk about formwork removal—specifically, removing formwork from the structural frame (after installing void pipes and PVC pipes, followed by rebar insertion and anchoring…)
Next-Generation Grid Frame | Available to Everyone
Hello, everyone. This is Enta. Welcome to Enta’s “Groundbreaking!” segment, where we always introduce innovative products. (Did something like that even exist?) Today, I’d like to introduce a product from Shin Nippon Ryokka, a company that visited our office the other day—it’s called the “Grid Frame.” I’m sure many of you are already familiar with it…
The Issue of Heron's Kay's Name Recognition | Experiencing the Impact of the Blog Firsthand on Site
Hello, everyone. This is Enta. Lately, wherever I go, people tell me they’ve been reading my blog. It seems that writing every day for the past year is finally paying off. As expected, if you keep at it, you’ll see some kind of result or outcome. The pros and cons are also part of those results and outcomes. …
Concrete Cover for Reinforcing Bars | Regulations on Cover Thickness for Formwork
Hello, everyone. This is Enta. Things have been pretty hectic from September through October. We’ve been repeating the same cycle: completing a small job in a week, packing up, and moving on to the next one. Transporting the equipment and coordinating everything is really tough, but it’s actually pretty rewarding. (laughs) Our employees are busy too, but when it comes to transportation…
About Crack-Prevention Materials (Part 5)
Hello, everyone. It’s Enta here. One way or another, the three-day weekend is over. Well, it was just a regular Sunday, right? (laughs) I went to the Rock Bolt construction site the other day. The hardest part is climbing the stairs! One trip up and I’m exhausted; two trips and I’m completely wiped out. My weak legs and lower back are really getting the best of me…
About Crack-Prevention Materials (Part 3) | Toughlight RG One-Week Strength
Hello, everyone. It’s Enta. The other day, I dropped my phone in the river at the job site... lol. It got swept away by the muddy current... sob. Anyway, when I tried to locate my iPhone, the GPS was picking up a signal, but the coordinates were vague. I’m thinking of going to check it out sometime soon. Bored…
About Crack Prevention Materials (Part 2) | Ground Anchor Installer Certification Renewal
Hello, everyone. This is Enta. The other day, I attended a refresher course to renew my Ground Anchor Installer certification. The instructor in Nagoya is a senior technician I look up to—someone I often call when I’m stuck at work. He explains things so clearly that I end up calling him all the time, lol. I’m always grateful…
About Crack-Prevention Materials (Part 1) | Comparison with Nafuroku
Hello. This is Enta. I thought I’d posted this the other day, but it turns out I hadn’t. My apologies. I’d like to introduce a product I tried while testing various crack-preventive materials that I thought was pretty good. I think Nafuroku is the one most people use frequently. With a simple formwork…



