A drop in the bucket
2020/02/10

Drill Slime Is Useless | The Meaning of Gathering

Hello, everyone. This is Enta. You haven’t collected core samples from every single borehole, have you? They’re collected to verify whether the soil conditions at the site match the planned soil profile. But it’s even questionable whether those samples represent the same soil type. Well, it depends on the supervisor…

Drilling Slime
2020/02/02

Collecting a Rare Burrowing Slime | Soil Analysis

Hello, everyone. This is Enta. I’ve been drilling at a certain job site since last month. It’s a temporary ground anchor project, and there’s a clay layer in Nagoya City called the Atsuta Formation. This clay layer is incredibly strong—it just won’t dissolve, lol. And as a result, we’re facing this situation…

Options
2020/01/30

Pressure Injection is Optional | Grouting Services

Hello, everyone. This is Enta. Do you have any standards (in your own mind) for the pressure applied during ground anchor installation? Roughly speaking, what level of grout pressure do you think is appropriate? Basically, a pressure of around 0.2 MPa is sufficient, but if you can increase the pressure beyond that…

Great Stuff
2020/01/21

How to Make a Hose Clamp | DIY Techniques

Hello, everyone. This is Enta. Here’s how to make a hose clamp, which a lot of you have been asking for lol. It’s actually really simple to make, but you’ll need to get the largest pair of vise pliers you can find. Top (TOP) Vise Pliers VP-250. And the cheapest pair…

Organizing Documents
2020/01/20

Unique Documents Created Through Attention to Detail | Construction Management

Hello, everyone. This is Enta. I tried creating an Excel spreadsheet to calculate the load on the load-bearing elements of temporary ground anchors for KTB Ground Anchor Works. Actually, there used to be a tension plan attached here, but I deleted it for now since I wasn’t sure if there was any demand for it lol. Protection and…

They're all different.
2020/01/09

All Different Miracles | The Slope Construction Site

Hello, everyone. This is Enta. The other day, I was looking at the drawings for a certain job site. It’s a ground anchor project, but the drawings say “rock bolt work.” The structural drawings show KTB anchors. I figured it must be a mistake…

Removable Anchor
2019/12/26

Removal Limits for Removable Anchors | Retrievable Range

Hello, everyone. This is Enta. The local government asked me, “When it comes to removable temporary ground anchors, does ‘removable’ mean they can all be removed?” So I’m putting together some documents on that, lol. Here’s the basic structure of a temporary anchor: Load-bearing element, cable ties, polyethylene pipe (coating for PC steel strands), Po…

A Bright Future for Slope Construction Companies
2019/12/24

Expanding the Scope of Your Work | Skills in the Construction Industry

Hello, everyone. This is Enta. I’m truly humbled by all the calls I’ve been receiving from various sources lately. I’m handling them in the order they come in, but if you haven’t received a quote or other response yet, please send me an email to follow up. There’s a good chance I might have overlooked it (or forgotten about it? lol). I actually missed one today as well…

Steel Base
2019/12/20

Guidelines for Project Management of Temporary Ground Anchor Work (Retaining Wall Anchors)

Hello, everyone. This is Enta. I’m at a job site where we’re installing temporary anchors for the third time. We’ve been doing a lot of temporary anchor work lately. That’s right. Since we’ve recently started taking on urban civil engineering projects, the number of times we’ve been called in has gone up, lol. We have three temporary anchor projects lined up by next year. (Including those currently in progress…)