Considering Set Loss in Ground Anchor Construction
Hello, everyone. This is Enta. I just got back from Kagoshima the other day, and today a junior from Kagoshima came to Nagoya and stopped by the office lol. He’s a junior from the Kagoshima Jitsugyo High School swim team, and now works for a major construction company specializing in slope stabilization and foundation work—he’s the branch manager in Kagoshima! My head is already…
When the results of a ground anchor suitability test fall outside the upper and lower limits
Hello, everyone. This is Enta. By the end of this month, five members of our second cohort—three Vietnamese employees at Enta and two at Izumi—will be leaving the company. One person will be staying on after their contract is extended, but it’s still going to feel lonely with so many leaving at once. I’m looking forward to the new technical interns arriving this spring, though…
What exactly is the Basic Exam? (In simple terms)
Hello, everyone. This is Enta. I’ve been conducting preliminary tests at a job site for the past few days. Have you ever done a preliminary test for ground anchor work? When performing this kind of ground anchor work, the key factor is the anchorage layer. This preliminary test is designed to verify that…
エンタグループ3社体制で2023年へ|株式会社テクノリンク仲間入り
皆さんこんにちは。 エンタです! 2022年ももう終わりです。 今年はどんな年でしたか? 私の今年は激動でしたw 何せ4月から3ヶ月ほどしっかりドップリ暇でしたwww エンタを創業して以来初めての暇で、ヒヤヒヤした年でした。 …
Design of Anchor Structures Over 10 Meters in Length | The Process for Preparing a Consultation Document Involving Government Agencies, Consultants, and Contractors
Hello, everyone. This is Enta. It’s really cold out there, isn’t it? I’ve even put on my extreme-cold base layer and electric-heated vest! Winter is really kicking into high gear now. It feels like winter is coming a bit late this year, but be careful of the snow! *We have openings on the Anchor Team! How about it? We can also handle construction management…
Basic Principles of Landslide Mitigation Measures (Part 4)
Hello, everyone. This is Enta. It’s gotten a lot colder all of a sudden, so I’ve started wearing a neck warmer! (Around my neck.) Starting next week, I plan to start wearing an electric-heated vest! But anyway, this is the final installment in our series on basic landslide prevention measures: “Cutting, Managing, and Stabbing.” Let’s review…
Construction Sequence When a Landslide Begins | Why Drainage Is the Top Priority
Hello, everyone. This is Enta. Cracks have started to appear in the slope we’re currently working on. We’re installing anchors using a retaining frame at the top and a zabuton frame plus steel pressure plates at the bottom. The site itself collapsed due to heavy rain, and we’re currently working on its restoration. We’ve already shaped the slope to a certain extent…
Treating Ground Anchor Heads When Groundwater Levels Are High | Preventing Rust with Caulking
Hello, everyone. This is Enta. The other day, an acquaintance complained to me, saying, “The job postings for slope stabilization and anchor work are described in great detail, but I can’t seem to get any construction management positions!” Of course, this person is a construction manager. I bet they said it with a face like this lol …
Case Study: Collapse of a Rebar Insertion Project | Why It’s Still Useful Even If the Grout Peels Away
Hello, everyone. This is Enta. Here’s a photo of a collapse at a rebar insertion work site. The mortar has come loose, and the rebar insertion work is being pulled downward. The design anticipated a surface collapse and called for a combination of mortar and rebar insertion work. The collapse occurred deeper within the structure. It collapsed after it rained…