Construction Methods for Static Crushing (Part 1)

First, mark the areas to be poured.
How would you like to split it?
What should we split?
That being said, the most important thing is to determine what to divide by.
The manufacturer's website includes a shredding plan in the manual, so please review it carefully.

The key point here is loss.
Since it's clearly explained in the manual,
It’s best to follow those guidelines, but the most important ones to follow are the drilling diameter and drilling depth!

If the holes are too large or too long, it results in unnecessary waste.
When it comes to Blister, being precise is definitely the way to go.
I mean, it's a pretty big amount, after all~ lol
There's no point in having leftovers, so being precise is best!!
We often find ourselves just going ahead with things on the assumption that as long as they meet or exceed the design specifications, there won’t be a problem, but,
For static crushing operations, performance is as designed.
Both the drilling length and the drilling system.
And if the rock doesn't break even when the operation is carried out exactly as planned, it means the crushing plan is flawed.
Let's be thorough with construction management!