Hello, everyone.
This is Enta.

Have you ever seen construction work like this? (lol)

That's pretty bad, isn't it?
The reason is that this is...Instructions from the government officeThat's what I've heard, anyway.
It seems they're checking to see if an overflow is occurring.
So, that's what this mark is.
It ruined the whole look!

Personally, I’d rather not have the strong milk flow from the bottom right from the start lol
It'll get dirty, won't it? Like the frame and the mortar surface.
If you think about how much work it is to clean it when it gets dirty, it’s better not to spill it in the first place.
Actually, we don't need any photos to confirm the overflow.
I don't need it.
Quite a few people take photos, but even if you don't, it won't be an issue during the exam.
It is important that the entire borehole be filled with grout of the same composition.
So, while there’s not much we can do if there’s water inside the casing, we’ll try not to get it dirty as much as possible.
That way, it'll be easier to clean up later on.
After all, it’s always better when the work site looks neat and tidy.
If it looks like this photo, even if the frame itself turned out beautifully...
By the way, the item I introduced on my blog a while back is pretty stain-resistant.
Give it a try.
Using "Plus" for grout replacement makes it less prone to staining.
See you later.



