In formwork construction, should the mortar inside the formwork be sprayed at the same time!? Or not!??

Hello, everyone.

This is Enta.

How do you apply the mortar within the formwork?

Mortar within the frame

Should we spray them at the same time? Or should we spray them separately?

I actually wrote about this topic before, lol.

 

In this post, I’d like to write about the pros and cons.

 

Spray the formwork first, then spray the mortar inside the formwork.

Benefits

It becomes easier to measure the finished dimensions of the formwork. (Beam cross-section: length and width)

(Is there anything else besides this??)

 

Demerit

Increased Costs for Protective Covering Within the Frame

The bond between the frame and the mortar within the frame breaks, causing efflorescence (white deposits).

Grass grows where the roots have been severed

Prone to cracking

Increased Costs for Cleaning Inside the Frame

 

Spray the formwork and the mortar inside the formwork simultaneously

Benefits

Reducing Material Waste

Reducing the Cost of Protective Covering Within the Frame

Since the connections aren't broken, the overall strength is ↑↑↑

The finished product has a sense of cohesion (my personal opinion)

Shorter construction time (I think this is the biggest factor!)

It's coming together bit by bit, starting from the top!

Demerit

It’s a hassle when the area inside the frame is specified for shotcrete! Change it to mortar or obtain construction approval (design change).

 

Spray-Applied Concrete Worker


When you put it that way, there really aren't many downsides to playing both at the same time, are there?

On the other hand, the benefits of spraying them at the same time are just too great.

 

What do you all think?

 

See you later.