Hello, everyone.
This is Enta.

This is a continuation of my previous post.
I couldn't really cut corners when it came to the final layer.
Next, let's move on to the legal framework.
First, assemble the bottom reinforcing bars vertically, but before you do that, it’s important to stretch PP rope across the entire surface!!!
Basically, it's just marking out the lines.
No matter how small or simple the legal framework may be,Marking Out Is ImportantThat's it!!
This part is a bit of a shortcut.
Determine the position of the right or left rebar within the formwork frame, and be sure to mark the vertical and horizontal lines.
Make sure to mark the positions of the rebar across the entire surface.
The reason marking out is so important is that even experienced workers sometimes encounter areas they can’t fully anticipate.
There will definitely be cases where the pitch is too wide in some areas. (This deviates from the design specifications.)

And even a team of seasoned professionals, where every single member understands everything, makes mistakes.
If there's even one beginner or someone with just a few years of experience, let's mark the lines.
Since you just need to install the rebar along the string, it’s easy to explain, isn’t it?
Marking out the layout significantly reduces the likelihood of major mistakes later on.
In addition, laying out the lines makes it easier to visualize the subsequent construction work and simplifies the process of drawing up plans for the supervisor.
Let's make sure we never cut corners by skipping the layout process.
We're bound to make mistakes!
Let's always be prepared to take preventive measures.
That's why I won't cut corners!!
See you later.



