Hello, everyone.
This is Enta.

I've been practicing lathe work for the past few days lol
To those of you who are thinking, "Come on, forget all that—just hurry up with the quote!"
Just one hour, lol
What I was involved in was...
To be honest, I’d like to practice more and try my hand at thread cutting and stuff like that, but...
Yay, I'm done!!!
Just as I was thinking that, I got an email about the following matter...
It takes at least one week from the on-site survey to the issuance of the estimate.
Because I'm doing them in order, lol
Well, I've already sent most of the simple ones, though.
Work has been busy, but there are sometimes gaps of a week between jobs, so things just don't seem to be working out.
On-site coordination is difficult.
Just when you think things are settling down, a big request suddenly comes in—it’s just really hard to juggle everything.
Today, once again, it's all about the construction plan.
This construction plan is a plan developed during the design phase that outlines where and how to position the equipment and how to proceed with construction.
I think this is generally included in recent design projects.
Well, since I'm a contractor, I'm actually better at this than design, but drawing up the plans takes a lot of time.
It's definitely better than drawing by hand, but CAD is kind of a pain, lol.

Today, I'm hard at work drawing construction drawings for the tunnel.
I want to finish this today and move on to the cost estimate!
Even as I say that, I find myself reading *Kingdom* anyway lol
I'll just keep plugging away at it...
See you later.