Machine Selection
2023/01/16

When selecting construction equipment, the reference materials are often too outdated, so they frequently don’t suit the current job site.

Hello, everyone. This is Enta. I’m sure you’ve seen something like this before. It’s often attached to design calculations, isn’t it? And I imagine designers use this as a basis for their work. But doesn’t it happen quite often that the machine doesn’t actually fit the site? &nb…

工事と営業
2022/12/18

Results of a Slope Construction Company’s First Business Venture | A Success Story: Securing a Contract Through Design Collaboration

皆さんこんにちは。 エンタです。 今日マジで寒いですね! 私の住んでいる岩倉市でもマイナス1度でイイ感じに滑ってます(前日の雨で) 我々山の仕事なのでスタッドレスが常識ですし雪になれてるのでまぁなんとも思わないのですが、 都市部では大混乱で…

Design Request
2021/06/27

Is It Necessary to Get Quotes from Three Companies According to Government Regulations? | Reviewing Conventional Practices

Hello, everyone. It’s Enta here. Lately, I’ve been doing nothing but cost estimation and design... The construction sites are pretty packed too, so I’ll have to head over to the Kanto region starting next week, lol. Something I’ve been thinking about while doing cost estimation: what’s the deal with those “three-company quotes” we do as a matter of course? lol For example…

Motivation
2021/02/02

The End of the Fiscal Year Is Finally Over | The Busy Season Is Over for Slope Maintenance Contractors

Hello, everyone. This is Enta. Things have finally calmed down a bit. It looks like the postponed projects will end up being pushed back to April or later for one reason or another, so it looks like I’ll be able to take it easy in February and focus on machine maintenance. These past few years have been nonstop, with no days off. I still have a few postponed projects lined up for February and March, so I’ll be working nonstop. I won’t even have time to rest…

A "White Company"
2021/01/23

The End of the Fiscal Year Is Nearing | The Slope Maintenance Crew’s Final Push

Hello, everyone. This is Enta. I’ve been incredibly busy lately. Honestly, all I want to do is sleep (lol), but I’m working my butt off on paperwork, cost estimates, and site work. However, sometimes things don’t go as planned. That’s because everyone else is busy at the same time…

Cost Estimation Standards
2020/12/11

Sites You Should Know About When Preparing Cost Estimates | Information Sources

Hello, everyone. This is Enta. Are you doing quantity surveys? Well, when you say “quantity survey,” I think it’s mainly done by general contractors and branch-office contractors. If you work for a company that only does subcontracting, you might hardly ever see it. Design documents include design drawings, design calculations, design quantities, and design costs…

Document Preparation
2020/10/03

週末は煩悩を捨てて粛々と書類|法面屋の働き方

皆さんこんにちは。 エンタです。 先日から旋盤加工の練習をしていますw おいおい、そんな事良いから見積急げよ!って思われた方々。 1時間だけですwww 私が関わったのは・・・ 本当はもっと練習してねじ切りとかやりたいんですけど・・・・ &n…

Compression-bearing Structures; Backfill Material
2020/07/29

コンクリート製受圧板の裏には裏込め材必須|施工原則

皆さんこんにちは。 エンタです。 最近グラウンドアンカー工の施工で受圧板あるのに裏込め工が入っていない事が多々あるのです。 皆さんの現場ではどうですか? 地山はガタガタなんです。 にも関わらずザブトン枠とか無いんですよね。 先日も設計変更し…

ベトナム人 サンダー
2020/03/20

楽しめると派手になる?|法面屋のモチベーション

皆さんこんにちは。 エンタです。 今日、休日なんですよ!!w が、私は今日までに提出予定の積算と施工見積と変更設計の計算書・・・・ 盛りだくさんw   週休二日はどこえやらですねw そして、社員は3月全く休み無しの現場へ・・・・(…