Hello, everyone.
This is Enta.

I don't really want to make it, but I think I'll give it a try lol
That’s the “slime removal” step that’s always mentioned when supervising ground anchor construction.
Even though I explained to the general contractor that it was pointless, the government office insisted that we get the permit.
Even though I explained to the government office that it was pointless, the inspector insisted that I get it.
However, just because they took it doesn't mean it will be verified through an inspection; in the end, they'll just say it's being stored by the contractor, so from the contractor's perspective, it's just trash.

A jig to make it easier to remove.
Since I keep seeing the strainer I use to cook ramen (to skim off the scum) fly off every time, I finally get around to doing it.
Something that would make even that net unnecessary! I'll try designing it.
I'll introduce it again if I can.
See you later.