Hello, everyone.
This is Enta.
The other day, I got some good news and some bad news all at once lol
I can't tell you the good news yet, but I can't tell you the bad news either lol
As a result, I can't really say anything, though lol

However, the good news is that we’ve been holding meetings and working behind the scenes for the past few months, so this is just the beginning.
Bad news might actually be good news for us, in a way.
I guess the truth is that he’s just relieved.
Well, anyway, you never know what might happen in life, but it really makes you realize how important it is to live an honest life.
Let's live with sincerity and care!
But that's beside the point.

I've modified this, lol.
This looks kind of like the guide cell from the drilling rig we used before to drive in the permanent drainage reinforcement pipes, lol.

This is it.
Previously, we would carry the formwork by hand to set it in place, secure it by pulling a wire from above, and use a separate wire to push it in the direction of concrete placement.
We modified the machine for this job so we could drill in a slightly confined space where a standard suspended drill rig wouldn't be able to operate.
It must be raised and lowered for use as a suspended drilling machine.
To make that possible, we use a winch to pull the wire.
With this, I think you'll be able to easily raise and lower it and drill holes.
I'm looking forward to next week, when we'll be conducting both a test run and the actual event on site.
If it goes well, I'll let you know.
See you later.



