Leaving a Mark on the Site | The Significance of Slope Contractors

Hello, everyone.

This is Enta.

Mortar Peeling

The mortar on the window frame is peeling off.

I was asked if this was a problem or not lol

 

What do you all think?

Yes or no?

 

Structurally, it works, but from a contractor’s perspective, it’s a no-go, lol.

To begin with, the mesh in the formwork is essentially considered part of the formwork itself.

Since the dimensions are guaranteed, even if the mesh is visible, there is no problem from a structural engineering standpoint.

But as a contractor, it’s a bit of a tricky situation, isn’t it? lol

It makes you wonder, doesn't it? lol

 

If I were the director, this is something I would point out.

After all, it doesn't look like careful work.

They say God is in the details, and when it comes to legal matters, it’s probably these kinds of small details.

As a contractor and construction supervisor, I believe that demonstrating my commitment to quality on-site has a direct impact on future projects.

Well, there are some people who are a little too particular and end up falling short, though lol.

 

What aspects do you pay special attention to?

Is it kind of like that thing comedians talk about—leaving a lasting impression? lol

Let’s show our own unique touch on the job site and leave our mark!

 

See you later.