Construction Data
2019/02/15

Construction Data Is Growing Rapidly | The Wave of Digitalization

Hello, everyone. It’s Enta here. My computer keeps telling me, “I’m out of space!” lol. Since I built my PC myself, it’s easy to swap out the hard drive, and the one currently installed is 1T (1 terabyte). Since that’s full, I’m thinking maybe I should buy a 4T one…

Better safe than sorry
2019/02/14

Be Prepared for Construction Management, and You'll Have Nothing to Worry About | Advance Preparation

Hello, everyone. This is Enta. Lately, I’ve been struggling because I didn’t understand the basis for the seed-blowing mix design, lol. The thing is, I’ve never actually managed a seed-blowing project myself! The only part of seed-blowing projects I’ve managed is the post-construction surveying. So, regarding the construction plan for seed-blowing…

Bolt Scale 300 mm
2019/01/26

Measurement of Layout Deviations in Ground Anchor Construction | Quality Control

Hello, everyone. This is Enta. Today, I’ll be showing you how to measure placement errors using a bolt scale on an anchor. The square scale marked on the bolt scale is called a scale plate. After drilling the anchor hole, remove the casing. Finally…

The Value of Speed
2019/01/24

Toshiba FlashAir SD Card | Technology for Instantly Sending Photos from the Field

Hello, everyone. This is Enta. Have you heard of this? It’s an SD card called Toshiba FlashAir. It’s a flash memory card for cameras, but it can communicate wirelessly all on its own! To put it simply, when you take a group photo with a regular camera (like a compact or DSLR)…

Drilling Fluid, Blue
2019/01/21

Handling Grout Uplift in Ground Anchor Construction | General Contractor and Contractor

Hello, everyone. This is Enta. It’s been a busy week. I’ve been running all over the place, lol. Right now, we’re in the middle of installing ground anchors at the job site. While we were drilling, grout started spurting out of the hole from the anchor right before it! Now what do we do? The drilling has connected this hole to the one next to it…

Drilling Length
2018/10/21

Use Super Yellow for Drilling Length | Utilizing Color Paint

Hello, everyone. This is Enta. This is my last Sunday in Hokkaido. Since last night, I’ve been out having a blast with my employees in Obihiro. It was fun. It was just plain fun!! That said, there’s still a little construction work left to do on Monday, but since we’ve almost finished cleaning up and everything else, I’m feeling pretty relaxed. …

The Challenges of Construction Management
2018/10/13

On-Site Guidelines | Metrics for Construction Speed and Quality

Hello, everyone. This is Enta. The other day, I was so close to drilling four 23-meter holes—lol. I have to be present for every single one, but I don’t get there until just before 10:00 a.m. If only I didn’t lose that much time… But there’s no point in saying that, so I’ll just keep doing my best! Life is always a learning…

Anchor Worker
2018/09/27

Installing Load Cells in Anchor Assemblies | Continuous Monitoring of Tensile Force

Hello, everyone. This is Enta. Lately, I’ve been drilling nothing but anchors. Until now, our employees handled this, so I never really paid much attention to it, but now I’m starting to notice things I hadn’t before. The thing is, I hate that “craftsman’s intuition” thing, lol. I feel like I’m starting to understand that “intuition” a little bit…

Elastic Displacement-Strain Curve
2018/09/22

Applications of Displacement Data from Pressure-Bearing Structures | Utilizing Measurement Data

Hello, everyone. This is Enta. Until just the other day, Hokkaido was enjoying absolutely beautiful autumn weather, wasn’t it? It gets pretty chilly in the mornings and evenings, but the weather is pleasant overall. I’d like to make sure I don’t get sick from the temperature changes. Today, though, it’s cloudy and drizzling a bit. But enough of that. Why do we measure the sag of the load plate…