- HOME
- List of Articles
- The Classic Approach
Measures to Address Substandard and Improper Construction
Hello, everyone. This is Enta. I’ve been back on-site for the first time in a while these past few days. Being on-site really is the best, isn’t it? ^^ But anyway, there have been plenty of cases of misconduct in the past. As a result, construction management is getting stricter and stricter. I want to put an end to this. Construction defects and misconduct in slope stabilization work …
Measures to Address Substandard and Improper Construction
Hello, everyone. This is Enta. There have been plenty of cases of substandard and fraudulent construction in the past. As a result, construction management is becoming increasingly strict. I want to put an end to this. Defective and fraudulent construction in slope stabilization work: 1. Cutting of prestressed steel strands and prestressed steel bars used in anchor work. 2. Anchor work…
Measures Against Substandard and Improper Construction | Learning from Past Cases
Hello, everyone. This is Enta. I’ve been in talks with a lubricant manufacturer recently. The reason is that our anchor drilling machines are subject to severe wear and tear, so we want to use the best possible grease and lubricants. We want to reduce machine problems as much as possible. By doing so, we can…



