About Reinforcement Bar Installers and Scaffolders

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #49201 Reply
    Construction Engineer
    Guest

    On a slope with a gradient of 1:0.6 to 1:1.1 and a length of 24 m, sprayed concrete formwork will be installed across the entire slope. Reinforcement bars (L = 4.5 m) will be inserted in the upper half of the slope, while the lower half will be constructed using only the main anchors of the sprayed concrete formwork. Initially, scaffolding (single-tube scaffolding) was budgeted only for the upper half of the slope. However, the contractor submitted a proposal stating that, based on the original plan, there was a risk of tipping or collapse and requesting that scaffolding be installed across the entire slope. Is it generally standard practice to install scaffolding across the entire slope?

    #52240 Reply
    EntertainmentEntertainment
    Keymaster

    I'm sorry I didn't notice.

    I'll write about this on my blog soon.

    I know it's probably too late, but I'd appreciate your help.

Viewing 2 posts - 1 through 2 (of 2 total)
Re: Regarding Reinforcement Bar Installers and Scaffolders
Your information: