{"id":66438,"date":"2026-08-01T08:00:48","date_gmt":"2026-07-31T23:00:48","guid":{"rendered":"https:\/\/norimen.net\/?p=66438"},"modified":"2026-07-30T11:17:56","modified_gmt":"2026-07-30T02:17:56","slug":"soil-nailing-design-concept","status":"publish","type":"post","link":"https:\/\/norimen.net\/en\/soil-nailing-design-concept\/","title":{"rendered":"Does the Anchorage for Rebar Insertion Have to Be in Bedrock? | Explaining the Design Concepts of Movable and Immovable Soil Masses"},"content":{"rendered":"<p>Hello, everyone.<\/p>\n<p>This is Enta.<\/p>\n<p>August is here!<br \/>\nIt's been way too hot ever since before summer even really kicked in\u2014it's really draining my energy.<\/p>\n<p>Seriously, this year has been absolute hell, and I'm totally wiped out...<\/p>\n<p>But that's beside the point.<\/p>\n<p>This time, we\u2019ll discuss \u201cdisplaced soil masses\u201d and \u201cundisplaced soil masses\u201d in the context of rebar installation (rock bolting) work.<\/p>\n<p>During inspections or progress checks, inspectors or government officials sometimes ask me this.<\/p>\n<p>\"Are the anchorage points of these rebar properly embedded in the bedrock?\"<\/p>\n<p>I think there are quite a few site supervisors working for general contractors who freeze up because they don't know how to respond to this.<\/p>\n<p>Honestly, the more honest you are, the more you end up thinking, \u201cAs the general contractor, I can\u2019t exactly say I don\u2019t know, but honestly, I have absolutely no clue\u2026\u201d lol<\/p>\n<p>So, what is our answer as experts in this field?<\/p>\n<h3>The answer to \"Is it embedded in bedrock?\" is \"I don't know\" lol<\/h3>\n<p>To cut to the chase, the answer is \"I don't know\" lol<\/p>\n<p>To begin with, the interior of the natural ground is never so neatly divided that you can say, \u201cThis far is the moving soil mass, and from here on is the stationary soil mass.\u201d<\/p>\n<p>The degree of weathering, the cracks, and the groundwater all vary continuously, so in reality, they\u2019re all part of the same picture.<\/p>\n<p>It's just that the design is based on that concept.<\/p>\n<p>Moreover, the borehole surveys are not being conducted along the exact same lines as the positions and angles of the rebar.<\/p>\n<p>In fact, there are even some small-scale sites where no soil surveys have been conducted at all.<\/p>\n<p>In a situation like that, asking, \u201cDid we hit bedrock? Did it anchor properly into the bedrock?\u201d is just nonsense\u2014and honestly, it makes you wonder, \u201cDo they even know anything about construction??\u201d lol<\/p>\n<p>However, since simply saying \u201cI don\u2019t know\u201d on-site will cause a huge backlash (lol), the main point here is to make sure we can explain\u2014based on design principles\u2014why it\u2019s actually okay not to know.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66440\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b2c008270c27280bd3b944af532166d1.jpg\" alt=\"Site Supervisors Struggling with Inspections of Rebar Installers\" width=\"600\" height=\"338\" \/><\/p>\n<h3>\"Displaced soil masses\" and \"stationary soil masses\" are \"design assumptions.\"<\/h3>\n<p>Let's start by reviewing the definitions of the terms.<\/p>\n<p>According to the definitions in the Design and Construction Manual for Soil Reinforcement Methods for Natural Slopes (Heisei 25, 4th printing), a sliding soil mass (moving soil mass) is defined as \u201ca mass of soil assumed to slide outward from the slope in a slope stability analysis (limit equilibrium method).\u201d<\/p>\n<p>The key point is the phrase \u201cassumed.\u201d<\/p>\n<p>The \u201cslide surface\u201d that separates the moving soil mass from the stationary soil mass is a line defined within the limit equilibrium method of calculation; it is not a line that was confirmed by actually excavating the ground.<\/p>\n<p>The chapter on investigations in the same manual also states that \u201cassumed slip surfaces\u201d should be indicated in the figures for areas with low stability.<\/p>\n<p>It's just a \"hypothesis,\" after all.<\/p>\n<p>Furthermore, at many sites, the borehole surveys that serve as the basis for determining the slip surface consist of only a few vertical boreholes.<\/p>\n<p>Since drilling for rebar insertion is often performed at an angle ranging from horizontal to downward at about 5 to 45 degrees, there is no geological data available for the same angle and position as the rebar to begin with.<\/p>\n<p>For small-scale projects, there are cases where the design is based solely on survey results and field investigations of the surrounding area.<\/p>\n<p>It\u2019s actually quite common for the line of the assumed slip surface drawn on the design drawings to differ from (or not match) the actual rock mass encountered during drilling.<\/p>\n<p>In other words, the terms \u201cmovable soil mass\u201d and \u201cimmovable soil mass\u201d refer to a design model in which the natural ground is divided into two parts for calculation purposes; they do not indicate that boundary lines have actually been drawn on the natural ground at the site.<\/p>\n<p>This is the important part of the story, lol.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66441\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/8248a0108650f27796ca2618cfe889a4.jpg\" alt=\"Schematic Cross-Sections of Moving and Stationary Soil Masses\" width=\"600\" height=\"338\" \/><\/p>\n<h3>Reinforcement Bar Insertion Method Is the \u201cFull-Surface Anchoring Type\u201d | This Method Is Not Designed to Anchor into Bedrock<\/h3>\n<p>According to the manual, the basic approach for reinforcement materials is the \u201cfull-anchorage type,\u201d in which the core material is anchored to the natural ground using cement slurry or similar materials, and the design is also based on the full-anchorage type.<\/p>\n<p>Furthermore, rather than applying prestress like a ground anchor, this reinforcement mechanism involves anchoring the reinforcement material to the natural ground along its entire length, and<\/p>\n<p>It is generally considered that, as the ground deforms, passive resistance is generated due to friction at the ground surface.<\/p>\n<p>The allowable tensile force Ta of the reinforcement to be considered in the design is determined by the following equation.<\/p>\n<p>Ta = min(Tsa, T1pa + Toa, T2pa)<\/p>\n<p>\u30fbTsa: Allowable tensile strength of the core material (rebar) itself<\/p>\n<p>\u30fbT1pa + Toa: Permissible pull-out resistance around the perimeter of the reinforcement on the side of the moving soil mass + bearing resistance provided by the surface material<\/p>\n<p>\u30fbT2pa: Allowable pull-out resistance on the surface of the reinforcement material on the side of the immovable soil mass<\/p>\n<p>&nbsp;<\/p>\n<p>In other words, the design is determined not by whether the ground is bedrock, but by the minimum value of the resistance to pull-out on both the inner and outer sides of the assumed slip surface.<\/p>\n<p>So the idea is that, out of the three potential weaknesses, the weakest one determines the upper limit of effectiveness.<\/p>\n<p>So, what would happen if the natural ground on the side of the immovable soil mass were loose soil?<\/p>\n<p>The answer is simple: just calculate based on the frictional resistance at the surface of the soil and ensure the required length is maintained.<\/p>\n<p>Although it is generally preferable to determine the circumferential friction resistance coefficient \u03c4 through a pull-out test (conformity test), such tests are rarely conducted during the design phase; therefore, estimated values based on the type of rock mass (Explanatory Table 5.4) are generally used, or<\/p>\n<p>It is generally accepted that the smaller of the two values in the equation \u03c4 = \u03c3\u2032 \u00b7 tan\u03c6 + c (Equation (5.3) in the explanation) should be used.<\/p>\n<p>This table of estimated values is based on the lower limit values from actual pull-out test data for gravel and sand, and on values derived by applying an 80% discount to the standard values for rock and cohesive soil, for which data is limited.<\/p>\n<p>As you can see, there\u2019s absolutely no assumption anywhere in the design that \u201cit won\u2019t work unless it\u2019s embedded in bedrock,\u201d lol.<\/p>\n<p>If it's bedrock, it'll be a short job; if it's soil and sand, it'll take longer. That's all there is to it.<\/p>\n<p>When you're working on site, it feels stiff when it's short and soft when it's long, right?<\/p>\n<p>By the way, what's interesting is how the surface material is handled.<\/p>\n<p>When using a rigid continuous wall\u2014such as a cut-side reinforced earth wall\u2014as the surface material, it is acceptable to calculate using Ta = min(Tsa, T2pa), assuming that no soil mass will escape from the reinforcement on the side of the moving soil mass.<\/p>\n<p>It is said that even with lattice frames or sprayed concrete, they can be treated the same way as long as the surface material has sufficient strength and is adequately bonded to the reinforcing materials.<\/p>\n<p>In other words, as long as the frame and head plate are sturdy, the moving earth block is considered to be \u201csecure\u201d and won\u2019t come loose.<\/p>\n<p>Anyway, at least on paper, surface work isn't just for show, lol.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66442\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/1e1e522aebfa2f4fdc763bc7dc9df268.jpg\" alt=\"Circumferential Friction and Sliding Surface of an Anchor\" width=\"600\" height=\"338\" \/><\/p>\n<p>But actually, a 30 cm \u00d7 30 cm steel plate is really all you need...<\/p>\n<h3>It leads to misunderstandings because it\u2019s confused with ground anchors.<\/h3>\n<p>The reason people ask, \u201cIs it anchored to bedrock?\u201d is probably because they\u2019re confusing it with ground anchors.<\/p>\n<p>As defined in the Japan Geotechnical Society\u2019s \u201cStandards for the Design and Construction of Ground Anchors,\u201d a ground anchor is a construction method in which the entire anchor consists of the \u201canchor body length plus the anchor free length.\u201d<\/p>\n<p>The free span is a section that merely transmits force; as a general rule, a minimum length of 4 meters is maintained, and anchor bodies are installed in the solid bedrock at the rear to apply tensile force (prestress) and actively stabilize the surrounding rock mass.<\/p>\n<p>That is why, when it comes to anchors, \u201cwhich type of soil to anchor the anchor body into\u201d is the lifeline of the design.<\/p>\n<p>On the other hand, the rebar insertion method described earlier is the full-anchorage type.<\/p>\n<p>There is no concept of \"free length\"; the entire length\u2014including the moving soil mass\u2014is in contact with the ground and acts passively.<\/p>\n<p>There isn't actually a specific \"fixation point\" located deep inside.<\/p>\n<p>In the Guidelines for Road Earthworks: Cut Works and Slope Stabilization, ground reinforcement works are classified, along with retaining wall works, pile works, and ground anchor works, as \u201cstructural works that provide resistance to the sliding of landslides,\u201d but<\/p>\n<p>Just because they're lined up doesn't mean they work the same way.<\/p>\n<p>Asking a rebar installer, \u201cWhat\u2019s the anchoring substrate?\u201d just because it feels like an anchor is kind of like trying to apply the inspection criteria for a large trailer to a small pickup truck, lol.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66408\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/ed9549e3ddf89679f40f4a1661e155b7-1.jpg\" alt=\"Schematic Diagram of a Reinforcing Bar Insertion Tool\" width=\"600\" height=\"338\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3>So how does the field prove quality?<\/h3>\n<p>That said, if I just say, \u201cI don\u2019t know what\u2019s in the soil,\u201d during the inspection, the inspector will just get annoyed and call it a day, lol,<\/p>\n<p>I'll write down something the team can proudly show off lol<\/p>\n<p>The effectiveness of rebar insertion work depends on the following condition: \u201cThe reinforcement, at the length specified in the design, is fully encased in grout and bonded to the natural ground.\u201d<\/p>\n<p>So what we need to prove isn't what's inside the earth, but this.<\/p>\n<p><strong>\u30fbRecords of Drilling Length Measurements (As-Built Inspection) <\/strong><\/p>\n<p><strong>\u30fbLength of embedded rebar (Material Management)<\/strong><\/p>\n<p><strong>\u30fbDiameter (Specification Control)<\/strong><\/p>\n<p><strong> \u30fbManagement of grout mix proportions and injection volumes (quality control)<\/strong><\/p>\n<p><strong> \u30fbPhotos (status) of the fastening process for the head plate and nut<\/strong><\/p>\n<p>In short, just make sure to carry out standard construction management properly,<span style=\"color: #0000ff;\"><strong>\"It's packed in tightly, so there's no problem!\"<\/strong><\/span>That's fine<\/p>\n<p>&nbsp;<\/p>\n<p>It's easier to understand if you picture the actual situation on-site.<\/p>\n<p>For example, suppose you are drilling a hole for a 5-meter rebar insertion, and around the 3-meter mark, the hammer suddenly feels lighter, and the slurry being discharged becomes mixed with clay.<\/p>\n<p>All we know at this point is that \u201cthe nature of the natural ground seems to have changed at around 3 meters,\u201d and,<\/p>\n<p>No one can say for certain whether that is a design-intended slip surface or simply uneven weathering.<\/p>\n<p>The feel of the drill and the color of the slime are valuable pieces of information, but it\u2019s a stretch to conclude just from those alone that it\u2019s \u201csecurely anchored in the bedrock,\u201d isn\u2019t it?<\/p>\n<p>If, based on the feel during drilling or the slurry discharged, you determine that the rock mass is clearly worse than assumed in the design, this is not a matter of \u201cnot encountering bedrock,\u201d but rather a matter of design review.<\/p>\n<p>The proper thing to do is to consult with the supervisor and use that to lead to pull-out tests or design changes! (Not that I\u2019d actually do that in the middle of the process, lol.)<\/p>\n<p>Even in the manual, there\u2019s a bit of wishful thinking written in there, suggesting that it\u2019s desirable to conduct pull-out tests on the native soil at the early stages of construction and incorporate the results into subsequent work as part of \u201cinformation-based construction.\u201d lol.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-48019\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2022\/11\/2022-11-22-08.53.15.jpg\" alt=\"Basic Exam\" width=\"600\" height=\"450\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2022\/11\/2022-11-22-08.53.15.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2022\/11\/2022-11-22-08.53.15-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Even so, I suppose this would be the model answer if someone asked, \u201cDid you hit bedrock?\u201d<\/p>\n<p><strong>\"The rebar insertion method is a full-anchorage type and does not involve anchoring the rebar to bedrock. It is designed to provide resistance through circumferential friction with the surrounding rock mass on the side deeper than the assumed slip surface, and the required length is determined through design calculations based on the type of rock mass. During construction, we carefully manage the drilling, insertion, and grouting processes to ensure they are performed exactly according to the design length.\"<\/strong><\/p>\n<p>This should confuse most people and make them just mumble something, lol.<\/p>\n<p>If that still doesn't work, show them the diagram in the manual (the conceptual diagram of forces that takes moving soil blocks into account) lol<\/p>\n<p>After all, no one can actually see what's inside the earth.<\/p>\n<p>This applies to designers, inspectors, and us as well.<\/p>\n<p>That is precisely why the design explicitly states the assumption of a \u201cdesign slip surface\u201d and accounts for variations in the natural ground and construction through a safety factor.<\/p>\n<p>We prioritize safety at every step of the design process, and on-site, we ensure a full range of safety measures through safe materials, safe construction, and safe management!<\/p>\n<p>That's for sure!<\/p>\n<p>And leave evidence that the object was created exactly as hypothesized.<\/p>\n<p>Once you understand how these roles are divided, you won't have to freak out over \"Did the rock come out yet?\" anymore lol<\/p>\n<p>Let's say it with pride.<strong>\"We don't know what's inside the soil! But it contains exactly what was specified in the design!\" It's safe!<\/strong>Lol<\/p>\n<p>If anything, I think it\u2019s fine to just say, \u201cIt\u2019s exactly as designed!\u201d lol (So my answer is kind of half-assed after all? lol)<\/p>\n<p>&nbsp;<\/p>\n<p>See you later.<\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"2qz4dVodrw\"><p><a href=\"https:\/\/norimen.net\/en\/labor-shortage-leads-to-cutbacks\/\">The Era of Labor Shortages! Decide What to Cut Back on to Get By!<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cThe Era of Labor Shortages! Decide What to Cut Back on to Get By!\u201d \u2014 Shin-Ent\u2019s Slope Management Seminar\" src=\"https:\/\/norimen.net\/labor-shortage-cut-decisions\/embed\/#?secret=iRF9Tg0TSo#?secret=2qz4dVodrw\" data-secret=\"2qz4dVodrw\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>","protected":false},"excerpt":{"rendered":"<p>Hello, everyone. This is Enta. August is here! It\u2019s been way too hot ever since before summer even really kicked off\u2014it\u2019s enough to make your energy just melt away. Seriously, this year\u2019s been absolute hell, and I\u2019m totally wiped out\u2026 But anyway, today I\u2019d like to talk about \u201cdisplaced soil masses\u201d and \u201cundisturbed soil masses\u201d in the context of rebar installation (rock bolting) work. When it comes to inspections and stage-by-stage verification\u2026<\/p>","protected":false},"author":2,"featured_media":66444,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[30],"tags":[44,116,5520,14461],"class_list":["post-66438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lock-bolt","tag-44","tag-116","tag-5520","tag-14461"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.4 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e<\/title>\n<meta name=\"description\" content=\"\u9244\u7b4b\u633f\u5165\u5de5\uff08\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5\uff09\u3067\u691c\u67fb\u5b98\u306b\u300c\u5b9a\u7740\u90e8\u306f\u5ca9\u76e4\u306b\u5165\u3063\u3066\u3044\u308b\u306e\u304b\uff1f\u300d\u3068\u805e\u304b\u308c\u3066\u56f0\u3063\u305f\u4e8b\u306f\u3042\u308a\u307e\u305b\u3093\u304b\uff1f\u79fb\u52d5\u571f\u584a\u30fb\u4e0d\u52d5\u571f\u584a\u3068\u3044\u3046\u8a2d\u8a08\u4e0a\u306e\u4eee\u5b9a\u3068\u5168\u9762\u5b9a\u7740\u578b\u306e\u8003\u3048\u65b9\u3092\u3001\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5\u30de\u30cb\u30e5\u30a2\u30eb\u306e\u539f\u6587\u306b\u57fa\u3065\u3044\u3066\u73fe\u5834\u76ee\u7dda\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/norimen.net\/en\/soil-nailing-design-concept\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac\" \/>\n<meta property=\"og:description\" content=\"\u9244\u7b4b\u633f\u5165\u5de5\uff08\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5\uff09\u3067\u691c\u67fb\u5b98\u306b\u300c\u5b9a\u7740\u90e8\u306f\u5ca9\u76e4\u306b\u5165\u3063\u3066\u3044\u308b\u306e\u304b\uff1f\u300d\u3068\u805e\u304b\u308c\u3066\u56f0\u3063\u305f\u4e8b\u306f\u3042\u308a\u307e\u305b\u3093\u304b\uff1f\u79fb\u52d5\u571f\u584a\u30fb\u4e0d\u52d5\u571f\u584a\u3068\u3044\u3046\u8a2d\u8a08\u4e0a\u306e\u4eee\u5b9a\u3068\u5168\u9762\u5b9a\u7740\u578b\u306e\u8003\u3048\u65b9\u3092\u3001\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5\u30de\u30cb\u30e5\u30a2\u30eb\u306e\u539f\u6587\u306b\u57fa\u3065\u3044\u3066\u73fe\u5834\u76ee\u7dda\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/norimen.net\/en\/soil-nailing-design-concept\/\" \/>\n<meta property=\"og:site_name\" content=\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/norimenman\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/norimenman\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-31T23:00:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"338\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u30a8\u30f3\u30bf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@norimenman\" \/>\n<meta name=\"twitter:site\" content=\"@norimenman\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u30a8\u30f3\u30bf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/\"},\"author\":{\"name\":\"\u30a8\u30f3\u30bf\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\"},\"headline\":\"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac\",\"datePublished\":\"2026-07-31T23:00:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/\"},\"wordCount\":39,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg\",\"keywords\":[\"\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\",\"\u9244\u7b4b\u633f\u5165\u5de5\",\"\u6cd5\u9762\u5de5\u4e8b\",\"\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5\"],\"articleSection\":[\"\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/\",\"url\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/\",\"name\":\"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg\",\"datePublished\":\"2026-07-31T23:00:48+00:00\",\"description\":\"\u9244\u7b4b\u633f\u5165\u5de5\uff08\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5\uff09\u3067\u691c\u67fb\u5b98\u306b\u300c\u5b9a\u7740\u90e8\u306f\u5ca9\u76e4\u306b\u5165\u3063\u3066\u3044\u308b\u306e\u304b\uff1f\u300d\u3068\u805e\u304b\u308c\u3066\u56f0\u3063\u305f\u4e8b\u306f\u3042\u308a\u307e\u305b\u3093\u304b\uff1f\u79fb\u52d5\u571f\u584a\u30fb\u4e0d\u52d5\u571f\u584a\u3068\u3044\u3046\u8a2d\u8a08\u4e0a\u306e\u4eee\u5b9a\u3068\u5168\u9762\u5b9a\u7740\u578b\u306e\u8003\u3048\u65b9\u3092\u3001\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5\u30de\u30cb\u30e5\u30a2\u30eb\u306e\u539f\u6587\u306b\u57fa\u3065\u3044\u3066\u73fe\u5834\u76ee\u7dda\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#primaryimage\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg\",\"width\":600,\"height\":338,\"caption\":\"\u9244\u7b4b\u633f\u5165\u5de5\u3068\u659c\u9762\u5b89\u5b9a\u56f3\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u30db\u30fc\u30e0\",\"item\":\"https:\\\/\\\/norimen.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"description\":\"\u6cd5\u9762\u306e\u4e8b\u3092\u672c\u6c17\u3067\u77e5\u308a\u305f\u3044\u3042\u306a\u305f\u3078\uff01\",\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"alternateName\":\"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/norimen.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"alternateName\":\"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/norimenman\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\",\"name\":\"\u30a8\u30f3\u30bf\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"caption\":\"\u30a8\u30f3\u30bf\"},\"description\":\"\u5927\u624b\u6cd5\u9762\u5c02\u9580\u5efa\u8a2d\u4f1a\u793e\u306b\u5c31\u8077\u5f8c\u300132\u6b73\u3067\u72ec\u7acb\u3002 \u3042\u307e\u308a\u306e\u6687\u3055\u306b\u30d6\u30ed\u30b0\u3092\u958b\u8a2d\u3002\u6cd5\u9762\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3001\u3042\u308a\u3068\u3042\u3089\u3086\u308b\u8cea\u554f\u306b\u7b54\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u305d\u306e\u7d50\u679c\u3001\u6cd5\u9762\u696d\u8005\u3001\u5143\u8acb\u696d\u8005\u3001\u305d\u306e\u4ed6\u30bc\u30cd\u30b3\u30f3\u304b\u3089\u306e\u554f\u3044\u5408\u308f\u305b\u3001\u8cea\u554f\u3001\u53d7\u6ce8\u304c\u5897\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u30a2\u30e1\u30d6\u30ed\u3067\u306f\u30bd\u30b3\u30bd\u30b3\u95b2\u89a7\u304c\u5897\u3048\u3001 \u305d\u3053\u3067\u72ec\u81ea\u30c9\u30e1\u30a4\u30f3\u3092\u53d6\u5f97\u3057\u5c11\u3057\u3067\u3082\u5feb\u9069\u306a\u30d6\u30ed\u30b0\u3092\u76ee\u5dee\u3059\u3079\u304f\u3001\u30a2\u30e1\u30d6\u30ed\u304b\u3089\u306e\u5352\u696d\u3092\u6c7a\u3081\u307e\u3057\u305f\u3002 \u4eca\u5f8c\u3082\u3053\u3061\u3089\u3067\u5305\u307f\u96a0\u3055\u305a\u5168\u3066\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3066\u3044\u3053\u3046\u3068\u601d\u3063\u3066\u3044\u307e\u3059\u3002 \u4eca\u5f8c\u3068\u3082\u3088\u308d\u3057\u304f\u304a\u9858\u3044\u7533\u3057\u4e0a\u3052\u307e\u3059\u3002\",\"sameAs\":[\"http:\\\/\\\/enta-d.co.jp\\\/\",\"https:\\\/\\\/www.facebook.com\\\/norimenman\\\/\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\\\/\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/entadnorimenman\"]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/soil-nailing-design-concept\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"width\":220,\"height\":50,\"caption\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Do Reinforcement Bars Need to Be Anchored in Bedrock? | Explaining the Design Concepts of Mobile and Immobile Soil Masses - Shin-Ent's Slope Management School","description":"Have you ever been stumped when an inspector asked you, \u201cIs the anchorage embedded in the bedrock?\u201d while working as a rebar installer (rock bolt installer)? Based on the original text of the Manual for Rock Mass Reinforcement Methods, this article provides an easy-to-understand explanation from a field perspective of the design assumptions regarding \u201cmobile rock masses\u201d and \u201cfixed rock masses,\u201d as well as the concept of full-face anchorage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/norimen.net\/en\/soil-nailing-design-concept\/","og_locale":"en_US","og_type":"article","og_title":"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac","og_description":"\u9244\u7b4b\u633f\u5165\u5de5\uff08\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5\uff09\u3067\u691c\u67fb\u5b98\u306b\u300c\u5b9a\u7740\u90e8\u306f\u5ca9\u76e4\u306b\u5165\u3063\u3066\u3044\u308b\u306e\u304b\uff1f\u300d\u3068\u805e\u304b\u308c\u3066\u56f0\u3063\u305f\u4e8b\u306f\u3042\u308a\u307e\u305b\u3093\u304b\uff1f\u79fb\u52d5\u571f\u584a\u30fb\u4e0d\u52d5\u571f\u584a\u3068\u3044\u3046\u8a2d\u8a08\u4e0a\u306e\u4eee\u5b9a\u3068\u5168\u9762\u5b9a\u7740\u578b\u306e\u8003\u3048\u65b9\u3092\u3001\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5\u30de\u30cb\u30e5\u30a2\u30eb\u306e\u539f\u6587\u306b\u57fa\u3065\u3044\u3066\u73fe\u5834\u76ee\u7dda\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002","og_url":"https:\/\/norimen.net\/en\/soil-nailing-design-concept\/","og_site_name":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e","article_publisher":"https:\/\/www.facebook.com\/norimenman","article_author":"https:\/\/www.facebook.com\/norimenman\/","article_published_time":"2026-07-31T23:00:48+00:00","og_image":[{"width":600,"height":338,"url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","type":"image\/jpeg"}],"author":"\u30a8\u30f3\u30bf","twitter_card":"summary_large_image","twitter_creator":"@norimenman","twitter_site":"@norimenman","twitter_misc":{"Written by":"\u30a8\u30f3\u30bf","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#article","isPartOf":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/"},"author":{"name":"\u30a8\u30f3\u30bf","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95"},"headline":"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac","datePublished":"2026-07-31T23:00:48+00:00","mainEntityOfPage":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/"},"wordCount":39,"commentCount":0,"publisher":{"@id":"https:\/\/norimen.net\/#organization"},"image":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","keywords":["\u30ed\u30c3\u30af\u30dc\u30eb\u30c8","\u9244\u7b4b\u633f\u5165\u5de5","\u6cd5\u9762\u5de5\u4e8b","\u5730\u5c71\u88dc\u5f37\u571f\u5de5\u6cd5"],"articleSection":["\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u5de5"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/norimen.net\/soil-nailing-design-concept\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/","url":"https:\/\/norimen.net\/soil-nailing-design-concept\/","name":"Do Reinforcement Bars Need to Be Anchored in Bedrock? | Explaining the Design Concepts of Mobile and Immobile Soil Masses - Shin-Ent's Slope Management School","isPartOf":{"@id":"https:\/\/norimen.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#primaryimage"},"image":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","datePublished":"2026-07-31T23:00:48+00:00","description":"Have you ever been stumped when an inspector asked you, \u201cIs the anchorage embedded in the bedrock?\u201d while working as a rebar installer (rock bolt installer)? Based on the original text of the Manual for Rock Mass Reinforcement Methods, this article provides an easy-to-understand explanation from a field perspective of the design assumptions regarding \u201cmobile rock masses\u201d and \u201cfixed rock masses,\u201d as well as the concept of full-face anchorage.","breadcrumb":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/norimen.net\/soil-nailing-design-concept\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#primaryimage","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","width":600,"height":338,"caption":"\u9244\u7b4b\u633f\u5165\u5de5\u3068\u659c\u9762\u5b89\u5b9a\u56f3"},{"@type":"BreadcrumbList","@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/norimen.net\/"},{"@type":"ListItem","position":2,"name":"\u9244\u7b4b\u633f\u5165\u5de5\u306e\u5b9a\u7740\u306f\u5ca9\u76e4\u3058\u3083\u306a\u304f\u3066\u3044\u3044\uff1f\uff5c\u79fb\u52d5\u571f\u584a\u3068\u4e0d\u52d5\u571f\u584a\u306e\u8a2d\u8a08\u6982\u5ff5\u3092\u89e3\u8aac"}]},{"@type":"WebSite","@id":"https:\/\/norimen.net\/#website","url":"https:\/\/norimen.net\/","name":"Shin-Ent's Slope Management Seminar","description":"For those of you who are serious about learning about slopes!","publisher":{"@id":"https:\/\/norimen.net\/#organization"},"alternateName":"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/norimen.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/norimen.net\/#organization","name":"Shin-Ent's Slope Management Seminar","alternateName":"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e","url":"https:\/\/norimen.net\/","logo":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#local-main-organization-logo"},"image":{"@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/norimenman","https:\/\/x.com\/norimenman","https:\/\/www.instagram.com\/enta.d"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95","name":"Entertainment","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","caption":"\u30a8\u30f3\u30bf"},"description":"After joining a major construction company specializing in slope stabilization, I went independent at the age of 32. With so much free time on my hands, I started a blog. I\u2019ve been sharing my expertise on slope stabilization and answering all kinds of questions. As a result, I\u2019ve seen an increase in inquiries, questions, and orders from slope stabilization contractors, general contractors, and other major construction firms. My traffic on Ameblo grew to a reasonable level, so I decided to move on from Ameblo by acquiring my own domain in order to create a more user-friendly blog. I plan to continue sharing all my expertise openly and honestly here. I look forward to your continued support.","sameAs":["http:\/\/enta-d.co.jp\/","https:\/\/www.facebook.com\/norimenman\/","https:\/\/www.instagram.com\/enta.d\/","https:\/\/x.com\/norimenman","https:\/\/www.youtube.com\/c\/entadnorimenman"]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/soil-nailing-design-concept\/#local-main-organization-logo","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","width":220,"height":50,"caption":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e"}]}},"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-09-27 21:31:21","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/b509ecf3bfbba26ebf9dc93425c9ddcf.jpg","_links":{"self":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/comments?post=66438"}],"version-history":[{"count":5,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66438\/revisions"}],"predecessor-version":[{"id":66448,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66438\/revisions\/66448"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media\/66444"}],"wp:attachment":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media?parent=66438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/categories?post=66438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/tags?post=66438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}