{"id":66115,"date":"2026-07-08T08:00:50","date_gmt":"2026-07-07T23:00:50","guid":{"rendered":"https:\/\/norimen.net\/?p=66115"},"modified":"2026-07-06T16:47:10","modified_gmt":"2026-07-06T07:47:10","slug":"unit-price-for-ground-anchor-drilling-by-soil-type","status":"publish","type":"post","link":"https:\/\/norimen.net\/en\/ground-anchor-drilling-unit-price-by-soil-type\/","title":{"rendered":"Why Unit Prices for Ground Anchor Drilling Vary So Much Depending on Soil Conditions | How Cost Estimation Works and Quotations"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66124\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/a2c55c047312343098f6e2e34274fd06.jpg\" alt=\"Unit Price for Ground Anchor Drilling: Cost Estimation Varies by Soil Type\" width=\"600\" height=\"338\" \/>Hello, everyone.<\/p>\n<p>This is Enta.<\/p>\n<p>A while back, a young field supervisor from another company asked me, \u201cDo you pay attention to the soil conditions when drilling holes for ground anchors?\u201d<\/p>\n<p>(No, seriously, you should really care about this, lol)<\/p>\n<p>If you underestimate the soil conditions when estimating costs, you'll be the one crying about it later.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-48819\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg\" alt=\"Drilling Machine\" width=\"600\" height=\"450\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>But that's beside the point.<\/p>\n<p>The unit cost for drilling in ground anchor construction can literally \u201cmore than double\u201d depending on the soil conditions.<\/p>\n<p>A lot of construction companies just kind of throw out a quote, thinking, \u201cHonestly, this is probably about right,\u201d don\u2019t they?<\/p>\n<p>I know exactly how you feel!<\/p>\n<p>But I think you know it\u2019s definitely better to review the design specifications carefully to confirm the stiffness before submitting a quote.<\/p>\n<p>In this session, we\u2019ll explain how to prepare a cost estimate while reviewing the 2026 cost estimation materials.<\/p>\n<h2>Cost Estimation for Ground Anchor Drilling Is Based on a Package System<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66116\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/4e3098cef3673d731074c62ea610a0b2.jpg\" alt=\"Illustrated Explanation of the Cost Estimation Package System for Ground Anchor Drilling\" width=\"600\" height=\"338\" \/><\/p>\n<p>First and foremost, cost estimation for ground anchor work is based on a package system.<\/p>\n<p>The term \u201cpackage\u201d refers to a system in which a series of tasks\u2014such as drilling, grout injection, steel fabrication and assembly, tensioning and anchoring, and head finishing\u2014are each billed as separate line items.<\/p>\n<p>According to the Ministry of Land, Infrastructure, Transport and Tourism\u2019s construction package-based cost estimation standards, when drilling for ground anchor work, \u201ccosts shall be calculated separately for each soil type.\u201d<\/p>\n<p>In other words, when there are mixed soil types at a site, the basic principle is to calculate quantities separately for each soil type.<\/p>\n<p>\"Just classifying everything as cohesive soil\" is a no-go.<\/p>\n<p>(I'll be in for a world of trouble later, lol)<\/p>\n<p>Incidentally, in this year\u2019s cost estimation guidelines (2026 Cost Estimation), as in the past, the following work items are listed separately in addition to drilling costs.<\/p>\n<p>\u2013 Drilling machine relocation service: 56,040 yen per visit<br \/>\n\u2013 Grout Injection Worker: 65,840 yen per cubic meter<br \/>\n\u2013 Steel processing, assembly, insertion, tensioning, anchoring, and head treatment: Vary depending on standards, load ratings, and corrosion protection specifications<\/p>\n<p>It is only when all these factors are taken into account that the \u201cunit price per anchor\u201d is determined.<\/p>\n<p>That\u2019s exactly why it\u2019s pointless to judge whether something is \u201ccheap\u201d or \u201cexpensive\u201d based solely on the drilling costs.<\/p>\n<h2>Why Unit Prices Vary by a Factor of 2 to 3 Across the Five Soil Classifications<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66117\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/34181c8e10919594d584093c7e7ced84.jpg\" alt=\"Comparison Chart Showing the Differences in Unit Prices Based on the 5 Soil Classifications for Ground Anchor Drilling\" width=\"600\" height=\"338\" \/><\/p>\n<p>Soil classifications for ground anchor drilling are broadly divided into five categories.<\/p>\n<p>1. Cohesive soils and sandy soils<br \/>\n2. Gravelly Soil<br \/>\n3. Soil with a mixture of good and bad stones<br \/>\n4. Soft Rock<br \/>\n5. Hard Rock<\/p>\n<p>The unit price for drilling varies significantly across these five categories.<\/p>\n<p>As for why things change...<\/p>\n<p>Basically, it\u2019s because the \u201ccutting speed (drilling efficiency)\u201d varies greatly depending on the soil type.<\/p>\n<p>In cohesive soil, the boring machine moves along smoothly, but when it hits hard rock, it takes several times as long to drill to the same depth.<\/p>\n<p>The longer it takes, the higher the labor and equipment costs will be.<\/p>\n<p>It's as simple as that: the unit price goes up.<\/p>\n<p>&nbsp;<\/p>\n<p>As of March 2017, the unit prices listed on this blog (skid-type, double-pipe system, borehole diameter 90 mm) were as follows.<\/p>\n<p><strong>Soil Classification: Unit Prices as of March 2017 (yen\/m)<\/strong><\/p>\n<p><strong>Clay and sandy soils ... 6,453<\/strong><\/p>\n<p><strong>Gravelly Soil... 10,610 <\/strong><\/p>\n<p><strong>Soil mixed with stones... 16,230<\/strong><\/p>\n<p><strong>Soft Rock... 13,080<\/strong><\/p>\n<p><strong>Hard   Rock... 17,240<\/strong><\/p>\n<p>When comparing cohesive soil to hard rock, there is a difference of approximately 2.67 times.<\/p>\n<p>(If you estimate this by thinking, \u201cIt\u2019s pretty much the same, right?\u201d, you\u2019re in big trouble lol)<\/p>\n<p>Please note that the unit price shown \ud83d\udc46 is for reference only and reflects the price as of March 2017.<\/p>\n<p>Since the current unit prices are revised annually, please be sure to always check the most up-to-date civil engineering construction unit prices. \ud83d\udc47<\/p>\n<h2>Current Drilling Unit Prices Based on 2026 Cost Estimation Data<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66118\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/beb1fedf417187c29c0f3096ecc56b6c.jpg\" alt=\"Ground Anchor Drilling Costs: 2026 Estimation Data\u2014Sample Unit Price Table by Soil Type and Drill Hole Diameter\" width=\"600\" height=\"337\" \/><\/p>\n<p>These are the drilling costs from the 2026 cost estimate documents that Enta has on hand.<\/p>\n<p>The unit prices (yen\/m) by soil type for a borehole diameter of 90 mm are as follows.<\/p>\n<p><strong>Soil Classification Unit Price (yen\/m)<\/strong><\/p>\n<p><strong>Clay and sandy soil... 9,387<\/strong><\/p>\n<p><strong>Gravelly soil... 15,450<\/strong><\/p>\n<p><strong>Soil mixed with stones... 23,680<\/strong><\/p>\n<p><strong>Soft Rock... 19,070<\/strong><\/p>\n<p><strong>Hard Rock... 25,120<\/strong><\/p>\n<p>Compared to 2017, prices have risen across all categories.<\/p>\n<p>Looking at clay and sandy soils, the price has gone from 6,453 yen to 9,387 yen, which is about 1.45 times as much.<\/p>\n<p>Although the unit price increases as the hole diameter gets larger, we are comparing them based on a diameter of 90 mm in this case.<\/p>\n<p>The price per unit for \u03c6115mm, \u03c6135mm, and \u03c6146mm is listed in the documentation; however, since the specifications vary depending on the diameter, please check the design carefully.<\/p>\n<p>Also, please note that this unit price applies solely to the \u201cdrilling cost.\u201d<\/p>\n<p>The costs for the boring machine relocation, grout injection, and steel fabrication and assembly mentioned earlier are billed separately.<\/p>\n<p>To be honest, there are quite a few documents that try to determine the unit price for the entire anchoring project based solely on drilling costs, and it\u2019s risky to make a judgment based on that lol.<\/p>\n<p>(Which means it costs 56,040 yen just to move it once, lol.)<\/p>\n<p>Make sure your quote includes all the items specified in the design!<\/p>\n<p>&nbsp;<\/p>\n<p>\ud83d\udc47\ud83d\udc47\ud83d\udc472026 Drilling Unit Price<\/p>\n<table style=\"width: 56.0986%; height: 120px;\" width=\"772\">\n<tbody>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"72\">Drill Hole Diameter<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"173\">Clay and Sandy Soil<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"125\">Gravelly Soil<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"152\">Soil mixed with stones and pebbles<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"125\">Soft rock<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\" width=\"125\">Hard Rock<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\">90<\/td>\n<td style=\"height: 24px;\">9,387<\/td>\n<td style=\"height: 24px;\">15,450<\/td>\n<td style=\"height: 24px;\">23,680<\/td>\n<td style=\"height: 24px;\">19,070<\/td>\n<td style=\"height: 24px;\">25,120<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f0f0; height: 24px;\">115<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\">13,790<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\">19,100<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\">28,800<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\">23,150<\/td>\n<td style=\"background-color: #f5f0f0; height: 24px;\">30,010<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\">135<\/td>\n<td style=\"height: 24px;\">16,940<\/td>\n<td style=\"height: 24px;\">23,220<\/td>\n<td style=\"height: 24px;\">33,350<\/td>\n<td style=\"height: 24px;\">28,300<\/td>\n<td style=\"height: 24px;\">36,130<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px; background-color: #f5f0f0;\">146<\/td>\n<td style=\"height: 24px; background-color: #f5f0f0;\">20,340<\/td>\n<td style=\"height: 24px; background-color: #f5f0f0;\">28,190<\/td>\n<td style=\"height: 24px; background-color: #f5f0f0;\">40,070<\/td>\n<td style=\"height: 24px; background-color: #f5f0f0;\">34,360<\/td>\n<td style=\"height: 24px; background-color: #f5f0f0;\">47,410<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Points to Keep in Mind When Preparing Estimates and Cost Calculations<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-66120\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/07\/0625e331a26d83cfaf7a0bebb5f8d2d1.jpg\" alt=\"Points to Note When Estimating Ground Anchors: Key Points for On-Site Inspection\" width=\"600\" height=\"338\" \/><\/p>\n<p>There are three points in particular that you should pay close attention to when preparing estimates and cost calculations:<\/p>\n<p><strong>\u2460 Be sure to record the number of times the drilling machine is moved<\/strong><\/p>\n<p>According to this document (2026 Aichi Prefecture Cost Estimates), the cost for relocation work is 56,040 yen per instance.<\/p>\n<p>The total cost varies significantly depending on how many anchors are installed and how many times they are relocated on site.<\/p>\n<p>Please carefully check the site layout and anchor placement.<\/p>\n<p>This is a basic concept, but let's say, for example, there are three levels of scaffolding. You lift it up to the first level of the on-site scaffolding. That counts as one lift.<br \/>\nLower it to the second level. That makes two times.<\/p>\n<p>Next, we'll lower it onto the ground. This isn't the third time, though...<\/p>\n<p>Therefore, if there are three levels, the relocation work will take place twice.<\/p>\n<p><strong>\u2461 Carefully calculate the amount of grout to be injected (the terms of the estimate are important)<\/strong><\/p>\n<p>The cost for grout injection work is 65,840 yen per cubic meter (based on the 2026 Aichi Prefecture cost estimate).<\/p>\n<p>The formula for calculating the grout injection volume is based on the borehole diameter and length; in the case of quantity takeoff, this is specified in the design quantities, but<\/p>\n<p>Since experience is factored into the estimate, please make sure to calculate it carefully lol<\/p>\n<p><strong>\u2462 Steel fabrication and assembly costs vary significantly depending on the load classification, corrosion protection specifications, and whether assembly is performed in a factory or on-site.<\/strong><\/p>\n<p>According to the 2026 Aichi Prefecture Cost Estimation Guidelines, the unit price is 40,860 yen per piece for double corrosion protection, PC steel strands, on-site assembly, lengths of 10 meters or less, and f &lt; 400 kN, provided that end treatment is included.<\/p>\n<p>Even with the same double anti-corrosion coating, the price drops to 18,570 yen per unit when assembled at the factory.<\/p>\n<p>(Even though there\u2019s a difference of about 2.2 times, factory processing is still cheaper because of the on-site assembly costs.)<\/p>\n<table style=\"width: 56.0986%; height: 1056px;\" width=\"772\">\n<tbody>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\" colspan=\"4\" width=\"522\">Anchor Steel Processing, Assembly, Insertion, Tensioning, Anchoring, and Head Finishing (Anchors)<\/td>\n<td style=\"height: 24px;\" width=\"125\"><\/td>\n<td style=\"height: 24px;\" width=\"125\"><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #b3d9ff; height: 24px;\"><\/td>\n<td style=\"background-color: #b3d9ff; height: 24px;\">Types<\/td>\n<td style=\"background-color: #b3d9ff; height: 24px;\">Length<\/td>\n<td style=\"background-color: #b3d9ff; height: 24px;\">Load<\/td>\n<td style=\"background-color: #b3d9ff; height: 24px;\">Whether or Not the Head Is Processed<\/td>\n<td style=\"background-color: #b3d9ff; height: 24px;\">Unit Price<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 504px;\" rowspan=\"18\">Double Corrosion Protection<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">PC steel strand<\/td>\n<td style=\"background-color: #f5f5f5; height: 168px;\" rowspan=\"6\">Within 10 meters<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">40,860<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 312px;\" rowspan=\"11\">On-site Assembly<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">37,040<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">44,560<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">40,750<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"background-color: #f5f5f5; height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">56,960<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">53,140<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 168px;\" rowspan=\"6\">More than 10 meters<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">42,370<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">38,550<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">46,080<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">42,260<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"background-color: #f5f5f5; height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">58,470<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">54,650<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 168px;\" rowspan=\"6\">PC Steel Strand (Factory-Assembled)<\/td>\n<td style=\"background-color: #f5f5f5; height: 168px;\" rowspan=\"6\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">18,570<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">14,750<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">21,110<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">17,290<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"background-color: #f5f5f5; height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">Available<\/td>\n<td style=\"background-color: #f5f5f5; height: 48px;\">30,020<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"background-color: #f5f5f5; height: 24px;\"><\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">None<\/td>\n<td style=\"background-color: #f5f5f5; height: 24px;\">26,200<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 504px;\" rowspan=\"18\">Basic Corrosion Protection<\/p>\n<p>(Temporary)<\/td>\n<td style=\"height: 24px;\">PC steel strand<\/td>\n<td style=\"height: 168px;\" rowspan=\"6\">Within 10 meters<\/td>\n<td style=\"height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">28,070<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 312px;\" rowspan=\"11\">On-site Assembly<\/td>\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">24,250<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">37,590<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">33,770<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"height: 48px;\">Available<\/td>\n<td style=\"height: 48px;\">56,960<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">53,140<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 168px;\" rowspan=\"6\">More than 10 meters<\/td>\n<td style=\"height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">29,580<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">25,760<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">39,100<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">35,280<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"height: 48px;\">Available<\/td>\n<td style=\"height: 48px;\">58,470<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">54,650<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 168px;\" rowspan=\"6\">PC Steel Strand (Factory-Assembled)<\/td>\n<td style=\"height: 168px;\" rowspan=\"6\"><\/td>\n<td style=\"height: 24px;\">f &lt; 400 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">17,470<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">13,650<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\">400 \u2264 f &lt; 1300 kN<\/td>\n<td style=\"height: 24px;\">Available<\/td>\n<td style=\"height: 24px;\">20,010<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">16,200<\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px;\">130 kN \u2264 f &lt; 2000 kN<\/td>\n<td style=\"height: 48px;\">Available<\/td>\n<td style=\"height: 48px;\">28,920<\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"height: 24px;\"><\/td>\n<td style=\"height: 24px;\">None<\/td>\n<td style=\"height: 24px;\">25,100<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In particular, I\u2019d like companies that rely solely on subcontracting to make sure they adjust their unit prices for each item.<\/p>\n<p>You must not use a \"lump-sum\" contracting method!<\/p>\n<p>Sandy soil \u25cb\u25cb m; unit price \u00d7 design length =<\/p>\n<p>Soft rock \u25cb\u25cb m; unit price \u00d7 design length =<\/p>\n<p>Please give me a quote based on that.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-50841\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2024\/02\/2024-02-28-10.25.51.jpg\" alt=\"Drilling Status\" width=\"600\" height=\"450\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2024\/02\/2024-02-28-10.25.51.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2024\/02\/2024-02-28-10.25.51-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>As I\u2019ve mentioned in previous articles, this is an issue that remains unresolved to this day.<\/p>\n<p>The unit price has been rising slightly every year.<\/p>\n<p>According to documents from the Ministry of Land, Infrastructure, Transport and Tourism, the Standard Unit Price Table for the Construction Package Cost Estimation Method is updated every fiscal year, and<\/p>\n<p>We have updated the base dates for machinery, labor, and material unit costs, as well as market unit prices, to reflect changes in prices.<\/p>\n<p>Unit prices are rising.<\/p>\n<p>But when it comes to the reality of the bidding process, even if unit prices rise, if the volume of work decreases, companies will compete to lower their prices.<\/p>\n<p>The trend of going after new business\u2014even at the expense of social insurance premiums and company profits\u2014remains unchanged to this day.<\/p>\n<p>The real question is, how many companies are actually making a profit while paying their social insurance and taxes in full?<\/p>\n<p>While the government is raising labor rates and urging companies to \u201cimprove working conditions,\u201d the reality is that competition is driving down rates at the front-line level.<\/p>\n<p>Gain a thorough understanding of the cost estimation process and prepare estimates using accurate unit prices.<\/p>\n<p>I believe that is the only way to survive in the long run.<\/p>\n<p>The latest drilling rates are updated every April and July.<\/p>\n<p>Be sure to check the latest edition of the \u201cCivil Engineering Construction Unit Prices\u201d or the contracting agency\u2019s cost estimation standards every year.<\/p>\n<p>&nbsp;<\/p>\n<p>By the way, I\u2019m thinking of using AI to create a calculation tool specifically for slopes that anyone can use, but I\u2019m wondering if there\u2019s actually a demand for it\u2014so for now, I\u2019m just steadily working on other things lol.<\/p>\n<p>Personally, I\u2019d like people who\u2019ve never done cost estimation and have no idea how much money the general contractor gets from the government to use this.<\/p>\n<p>I'm thinking that if I do that, I might start to get a better sense of unit prices, even if just a little.<\/p>\n<p>&nbsp;<\/p>\n<p>See you later.<\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"lbrD8pQE7J\"><p><a href=\"https:\/\/norimen.net\/en\/packer-cost-materials\/\">Cost Estimation Data for Packers | Unit Price Information<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cCost Estimation Materials for Packers | Unit Price Information\u201d \u2014 Shin-Ent\u2019s Slope Management School\" src=\"https:\/\/norimen.net\/packer-cost-material\/embed\/#?secret=GKLq5myHj8#?secret=lbrD8pQE7J\" data-secret=\"lbrD8pQE7J\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>","protected":false},"excerpt":{"rendered":"<p>Hello, everyone. This is Enta. A while back, a young site supervisor from another company asked me, \u201cDo you pay attention to the soil conditions when drilling holes for ground anchors?\u201d (Well, you better pay a lot of attention to them, lol.) If you underestimate the soil conditions when preparing a cost estimate, you\u2019ll be the one crying about it later. But anyway\u2026<\/p>","protected":false},"author":2,"featured_media":48819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[34,38],"tags":[272,14434,14435,14436],"class_list":["post-66115","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-slope-work","category-construction-management","tag-272","tag-14434","tag-14435","tag-14436"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e<\/title>\n<meta name=\"description\" content=\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u7a4d\u7b97\u306f\u30d1\u30c3\u30b1\u30fc\u30b8\u65b9\u5f0f\u3067\u571f\u8cea5\u533a\u5206\u3054\u3068\u306b\u5358\u4fa1\u304c\u5927\u304d\u304f\u5909\u308f\u308a\u307e\u3059\u30022017\u5e74\u6642\u70b9\u306e\u5b9f\u5358\u4fa1\u4e00\u89a7\u30682026\u5e74\u7a4d\u7b97\u8cc7\u6599\u3092\u4e26\u3079\u3066\u89e3\u8aac\u3002\u898b\u7a4d\u30fb\u7a4d\u7b97\u3067\u7d76\u5bfe\u306b\u5916\u305b\u306a\u3044\u52d8\u6240\u3092\u73fe\u583430\u5e74\u306e\u30a8\u30f3\u30bf\u304c\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/norimen.net\/en\/unit-price-for-ground-anchor-drilling-by-soil-type\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d\" \/>\n<meta property=\"og:description\" content=\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u7a4d\u7b97\u306f\u30d1\u30c3\u30b1\u30fc\u30b8\u65b9\u5f0f\u3067\u571f\u8cea5\u533a\u5206\u3054\u3068\u306b\u5358\u4fa1\u304c\u5927\u304d\u304f\u5909\u308f\u308a\u307e\u3059\u30022017\u5e74\u6642\u70b9\u306e\u5b9f\u5358\u4fa1\u4e00\u89a7\u30682026\u5e74\u7a4d\u7b97\u8cc7\u6599\u3092\u4e26\u3079\u3066\u89e3\u8aac\u3002\u898b\u7a4d\u30fb\u7a4d\u7b97\u3067\u7d76\u5bfe\u306b\u5916\u305b\u306a\u3044\u52d8\u6240\u3092\u73fe\u583430\u5e74\u306e\u30a8\u30f3\u30bf\u304c\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/norimen.net\/en\/unit-price-for-ground-anchor-drilling-by-soil-type\/\" \/>\n<meta property=\"og:site_name\" content=\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/norimenman\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/norimenman\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-07T23:00:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u30a8\u30f3\u30bf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@norimenman\" \/>\n<meta name=\"twitter:site\" content=\"@norimenman\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u30a8\u30f3\u30bf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/\"},\"author\":{\"name\":\"\u30a8\u30f3\u30bf\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\"},\"headline\":\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d\",\"datePublished\":\"2026-07-07T23:00:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/\"},\"wordCount\":92,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/2023-01-12-10.16.14-1.jpg\",\"keywords\":[\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\",\"\u524a\u5b54\u5358\u4fa1\",\"\u6cd5\u9762\u7a4d\u7b97\",\"\u30a2\u30f3\u30ab\u30fc\u5de5\u898b\u7a4d\"],\"articleSection\":[\"\u6cd5\u9762\u5de5\u5168\u822c\",\"\u65bd\u5de5\u7ba1\u7406\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/\",\"url\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/\",\"name\":\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/2023-01-12-10.16.14-1.jpg\",\"datePublished\":\"2026-07-07T23:00:50+00:00\",\"description\":\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u7a4d\u7b97\u306f\u30d1\u30c3\u30b1\u30fc\u30b8\u65b9\u5f0f\u3067\u571f\u8cea5\u533a\u5206\u3054\u3068\u306b\u5358\u4fa1\u304c\u5927\u304d\u304f\u5909\u308f\u308a\u307e\u3059\u30022017\u5e74\u6642\u70b9\u306e\u5b9f\u5358\u4fa1\u4e00\u89a7\u30682026\u5e74\u7a4d\u7b97\u8cc7\u6599\u3092\u4e26\u3079\u3066\u89e3\u8aac\u3002\u898b\u7a4d\u30fb\u7a4d\u7b97\u3067\u7d76\u5bfe\u306b\u5916\u305b\u306a\u3044\u52d8\u6240\u3092\u73fe\u583430\u5e74\u306e\u30a8\u30f3\u30bf\u304c\u89e3\u8aac\u3057\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#primaryimage\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/2023-01-12-10.16.14-1.jpg\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/2023-01-12-10.16.14-1.jpg\",\"width\":600,\"height\":450,\"caption\":\"\u524a\u5b54\u6a5f\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u30db\u30fc\u30e0\",\"item\":\"https:\\\/\\\/norimen.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"description\":\"\u6cd5\u9762\u306e\u4e8b\u3092\u672c\u6c17\u3067\u77e5\u308a\u305f\u3044\u3042\u306a\u305f\u3078\uff01\",\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"alternateName\":\"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/norimen.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"alternateName\":\"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/norimenman\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\",\"name\":\"\u30a8\u30f3\u30bf\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"caption\":\"\u30a8\u30f3\u30bf\"},\"description\":\"\u5927\u624b\u6cd5\u9762\u5c02\u9580\u5efa\u8a2d\u4f1a\u793e\u306b\u5c31\u8077\u5f8c\u300132\u6b73\u3067\u72ec\u7acb\u3002 \u3042\u307e\u308a\u306e\u6687\u3055\u306b\u30d6\u30ed\u30b0\u3092\u958b\u8a2d\u3002\u6cd5\u9762\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3001\u3042\u308a\u3068\u3042\u3089\u3086\u308b\u8cea\u554f\u306b\u7b54\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u305d\u306e\u7d50\u679c\u3001\u6cd5\u9762\u696d\u8005\u3001\u5143\u8acb\u696d\u8005\u3001\u305d\u306e\u4ed6\u30bc\u30cd\u30b3\u30f3\u304b\u3089\u306e\u554f\u3044\u5408\u308f\u305b\u3001\u8cea\u554f\u3001\u53d7\u6ce8\u304c\u5897\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u30a2\u30e1\u30d6\u30ed\u3067\u306f\u30bd\u30b3\u30bd\u30b3\u95b2\u89a7\u304c\u5897\u3048\u3001 \u305d\u3053\u3067\u72ec\u81ea\u30c9\u30e1\u30a4\u30f3\u3092\u53d6\u5f97\u3057\u5c11\u3057\u3067\u3082\u5feb\u9069\u306a\u30d6\u30ed\u30b0\u3092\u76ee\u5dee\u3059\u3079\u304f\u3001\u30a2\u30e1\u30d6\u30ed\u304b\u3089\u306e\u5352\u696d\u3092\u6c7a\u3081\u307e\u3057\u305f\u3002 \u4eca\u5f8c\u3082\u3053\u3061\u3089\u3067\u5305\u307f\u96a0\u3055\u305a\u5168\u3066\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3066\u3044\u3053\u3046\u3068\u601d\u3063\u3066\u3044\u307e\u3059\u3002 \u4eca\u5f8c\u3068\u3082\u3088\u308d\u3057\u304f\u304a\u9858\u3044\u7533\u3057\u4e0a\u3052\u307e\u3059\u3002\",\"sameAs\":[\"http:\\\/\\\/enta-d.co.jp\\\/\",\"https:\\\/\\\/www.facebook.com\\\/norimenman\\\/\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\\\/\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/entadnorimenman\"]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ground-anchor-drilling-unit-price-by-soil-type\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"width\":220,\"height\":50,\"caption\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Why Unit Prices for Ground Anchor Drilling Vary So Much Depending on Soil Conditions | How Cost Estimation Works and Quotations - Shin-Ent's Slope Management School","description":"Cost estimates for ground anchor drilling are calculated using a package pricing system, and unit prices vary significantly across five soil classification categories. This article compares a list of actual unit prices from 2017 with cost estimation data from 2026 and provides an explanation. Enta, with 30 years of on-site experience, explains the key points you absolutely cannot overlook when preparing estimates and cost calculations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/norimen.net\/en\/unit-price-for-ground-anchor-drilling-by-soil-type\/","og_locale":"en_US","og_type":"article","og_title":"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d","og_description":"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u7a4d\u7b97\u306f\u30d1\u30c3\u30b1\u30fc\u30b8\u65b9\u5f0f\u3067\u571f\u8cea5\u533a\u5206\u3054\u3068\u306b\u5358\u4fa1\u304c\u5927\u304d\u304f\u5909\u308f\u308a\u307e\u3059\u30022017\u5e74\u6642\u70b9\u306e\u5b9f\u5358\u4fa1\u4e00\u89a7\u30682026\u5e74\u7a4d\u7b97\u8cc7\u6599\u3092\u4e26\u3079\u3066\u89e3\u8aac\u3002\u898b\u7a4d\u30fb\u7a4d\u7b97\u3067\u7d76\u5bfe\u306b\u5916\u305b\u306a\u3044\u52d8\u6240\u3092\u73fe\u583430\u5e74\u306e\u30a8\u30f3\u30bf\u304c\u89e3\u8aac\u3057\u307e\u3059\u3002","og_url":"https:\/\/norimen.net\/en\/unit-price-for-ground-anchor-drilling-by-soil-type\/","og_site_name":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e","article_publisher":"https:\/\/www.facebook.com\/norimenman","article_author":"https:\/\/www.facebook.com\/norimenman\/","article_published_time":"2026-07-07T23:00:50+00:00","og_image":[{"width":600,"height":450,"url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","type":"image\/jpeg"}],"author":"\u30a8\u30f3\u30bf","twitter_card":"summary_large_image","twitter_creator":"@norimenman","twitter_site":"@norimenman","twitter_misc":{"Written by":"\u30a8\u30f3\u30bf","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#article","isPartOf":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/"},"author":{"name":"\u30a8\u30f3\u30bf","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95"},"headline":"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d","datePublished":"2026-07-07T23:00:50+00:00","mainEntityOfPage":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/"},"wordCount":92,"commentCount":0,"publisher":{"@id":"https:\/\/norimen.net\/#organization"},"image":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","keywords":["\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc","\u524a\u5b54\u5358\u4fa1","\u6cd5\u9762\u7a4d\u7b97","\u30a2\u30f3\u30ab\u30fc\u5de5\u898b\u7a4d"],"articleSection":["\u6cd5\u9762\u5de5\u5168\u822c","\u65bd\u5de5\u7ba1\u7406"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/","url":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/","name":"Why Unit Prices for Ground Anchor Drilling Vary So Much Depending on Soil Conditions | How Cost Estimation Works and Quotations - Shin-Ent's Slope Management School","isPartOf":{"@id":"https:\/\/norimen.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#primaryimage"},"image":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","datePublished":"2026-07-07T23:00:50+00:00","description":"Cost estimates for ground anchor drilling are calculated using a package pricing system, and unit prices vary significantly across five soil classification categories. This article compares a list of actual unit prices from 2017 with cost estimation data from 2026 and provides an explanation. Enta, with 30 years of on-site experience, explains the key points you absolutely cannot overlook when preparing estimates and cost calculations.","breadcrumb":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#primaryimage","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","width":600,"height":450,"caption":"\u524a\u5b54\u6a5f"},{"@type":"BreadcrumbList","@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/norimen.net\/"},{"@type":"ListItem","position":2,"name":"\u30b0\u30e9\u30a6\u30f3\u30c9\u30a2\u30f3\u30ab\u30fc\u524a\u5b54\u306e\u5358\u4fa1\u304c\u571f\u8cea\u3067\u3053\u3093\u306a\u306b\u5909\u308f\u308b\u7406\u7531\uff5c\u7a4d\u7b97\u306e\u4ed5\u7d44\u307f\u3068\u898b\u7a4d"}]},{"@type":"WebSite","@id":"https:\/\/norimen.net\/#website","url":"https:\/\/norimen.net\/","name":"Shin-Ent's Slope Management Seminar","description":"For those of you who are serious about learning about slopes!","publisher":{"@id":"https:\/\/norimen.net\/#organization"},"alternateName":"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/norimen.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/norimen.net\/#organization","name":"Shin-Ent's Slope Management Seminar","alternateName":"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e","url":"https:\/\/norimen.net\/","logo":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#local-main-organization-logo"},"image":{"@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/norimenman","https:\/\/x.com\/norimenman","https:\/\/www.instagram.com\/enta.d"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95","name":"Entertainment","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","caption":"\u30a8\u30f3\u30bf"},"description":"After joining a major construction company specializing in slope stabilization, I went independent at the age of 32. With so much free time on my hands, I started a blog. I\u2019ve been sharing my expertise on slope stabilization and answering all kinds of questions. As a result, I\u2019ve seen an increase in inquiries, questions, and orders from slope stabilization contractors, general contractors, and other major construction firms. My traffic on Ameblo grew to a reasonable level, so I decided to move on from Ameblo by acquiring my own domain in order to create a more user-friendly blog. I plan to continue sharing all my expertise openly and honestly here. I look forward to your continued support.","sameAs":["http:\/\/enta-d.co.jp\/","https:\/\/www.facebook.com\/norimenman\/","https:\/\/www.instagram.com\/enta.d\/","https:\/\/x.com\/norimenman","https:\/\/www.youtube.com\/c\/entadnorimenman"]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/ground-anchor-drilling-unit-price-by-soil-type\/#local-main-organization-logo","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","width":220,"height":50,"caption":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e"}]}},"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-08-31 18:16:19","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2023\/04\/2023-01-12-10.16.14-1.jpg","_links":{"self":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/comments?post=66115"}],"version-history":[{"count":5,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66115\/revisions"}],"predecessor-version":[{"id":66125,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/66115\/revisions\/66125"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media\/48819"}],"wp:attachment":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media?parent=66115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/categories?post=66115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/tags?post=66115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}