{"id":65722,"date":"2026-06-13T08:00:15","date_gmt":"2026-06-12T23:00:15","guid":{"rendered":"https:\/\/norimen.net\/?p=65722"},"modified":"2026-06-10T00:34:45","modified_gmt":"2026-06-09T15:34:45","slug":"ict-slope-construction-real-world-application","status":"publish","type":"post","link":"https:\/\/norimen.net\/en\/ict-slope-construction-real-site-use\/","title":{"rendered":"Are ICT Slope Construction Methods Really Practical on Site? | Considering 3D Surveying and As-Built Management from a Hands-On Perspective"},"content":{"rendered":"<p>Hello, everyone.<br \/>\nThis is Enta.<\/p>\n<p>With the trends of the past few years, the construction industry has been flooded with terms like ICT, DX, AI, and 3D data, hasn't it?<\/p>\n<p>To be honest, when I'm out in the field, I find myself wondering, \"Can we really use that in a legal setting?\"<\/p>\n<p>I think a lot of people probably think that.<\/p>\n<p>I mean, the director uses it quite a bit, but I'm wondering, \"What's it really like?\"<\/p>\n<p>If you work in earthwork, you'll understand. You attach machine guidance to a backhoe, use an automated system to control the bulldozer, and use a drone to measure the volume of soil.<\/p>\n<p>Well, it's easy to picture.<\/p>\n<p>But slope stabilization isn't really that simple, is it?<\/p>\n<p>The slope is steep, and the ground is uneven.<\/p>\n<p>Install the formwork, drive in the anchors, spray the mortar, assemble the formwork frame, inspect the finished surface, take photos, and prepare the documentation.<\/p>\n<p>That's the thing about slopes\u2014nothing ever goes exactly as planned, lol.<\/p>\n<p>This time, I\u2019ll write a simple guide for slope construction professionals.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-65724\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/8212ede250f2253f3c1904cdae63c0a5.jpg\" alt=\"Are ICT Slope Stabilization Techniques Actually Useful on Site?\" width=\"600\" height=\"329\" \/><\/p>\n<h2>What Kind of Construction Work Is ICT Slope Stabilization?<\/h2>\n<p>According to documents from the Ministry of Land, Infrastructure, Transport and Tourism and the National Institute for Land and Infrastructure Management, ICT slope stabilization is defined as the use of ICT in the construction process for slope stabilization.<\/p>\n<h3>Main Steps in ICT Slope Stabilization<\/h3>\n<p>The document primarily outlines the following process.<\/p>\n<ul>\n<li>3D As-Built Survey<\/li>\n<li>Creation of 3D Design Data<\/li>\n<li>Construction Management, Including 3D As-Built Management<\/li>\n<li>Delivery of 3D Data<\/li>\n<\/ul>\n<p>However, ICT slope stabilization work is treated as a related construction category of ICT earthwork.<\/p>\n<p>In other words, rather than slope stabilization work being the only area to undergo a complete and sudden transition to ICT on its own, I think it\u2019s more accurate to view it as the use of 3D data being integrated into the slope stabilization process as part of the overall earthwork and cut operations.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-65725\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/770b929621d6f1f4838467e35646e0a7.jpg\" alt=\"The Process of ICT Slope Stabilization\" width=\"600\" height=\"329\" \/><\/p>\n<h2>Surveying and as-built management are easy to use on-site.<\/h2>\n<p>So, does that mean we can't use ICT slope stabilization methods?<\/p>\n<p>I think it would be quite useful if we could distinguish between the parts that are ready for use and those that still require human judgment.<\/p>\n<h3>Surveying for the start of construction is a great fit.<\/h3>\n<p>In the old days, surveying slopes meant sending people into dangerous areas, where they would take measurements, drenched in sweat, using a tape measure, a surveying staff, and a prism.<\/p>\n<p>Of course, there are still situations where it\u2019s necessary.<\/p>\n<p>However, using UAV photogrammetry, laser scanners, total stations, GNSS, and other technologies makes it easier to obtain a 3D understanding of areas that are difficult for people to access.<\/p>\n<p>This technology has the potential to reduce the risks associated with sending personnel into particularly hazardous slopes, post-collapse sites, disaster recovery areas, and steep slopes\u2014all for the sole purpose of surveying.<\/p>\n<p>In fact, our company also provides drone-based surveying and quantity surveying services to our first-tier subcontractors.<\/p>\n<h3>Serves as explanatory material for as-built management<\/h3>\n<p>Even in as-built inspection, there are situations where having 3D data makes it easier to explain things.<\/p>\n<p>For example, show the client or general contractor the differences between before and after construction. Overlay design data with actual measurement data. Use a heat map to verify the as-built condition.<\/p>\n<p>In some cases, these are easier to understand than explanations based solely on paper drawings and photographs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-65726\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/1b3ffe8ae60d526b47f1ac149b902557.jpg\" alt=\"View Hazardous Areas in 3D\" width=\"600\" height=\"329\" \/><\/p>\n<h2>Slope stabilization cannot be completed with ICT alone<\/h2>\n<p>However, ICT is not a panacea.<\/p>\n<p>Trees blocking the way, overhangs, spring water, darkness, narrow passages, power lines nearby.<\/p>\n<p>There are plenty of workplaces like that.<\/p>\n<h3>On-site judgment is still required for slope stabilization work<\/h3>\n<p>Not every construction site\u2014whether it involves framing or mortar spraying\u2014proceeds smoothly and exactly according to the blueprints.<\/p>\n<p>In areas where the natural ground undulates, even if you only look at the beautiful 3D model that matches the design data, the question \u201cHow are we going to fit this in here?\u201d is bound to come up on site.<\/p>\n<p>Rope work, the texture of the sprayed surface, changes in the natural ground, the sound of drilling, and how the spring water flows.<\/p>\n<p>In this area, human experience still plays a major role.<\/p>\n<p>ICT is a tool.<\/p>\n<p>So, what you're saying is that it doesn't take over the entire decision-making process for you.<\/p>\n<p>Of course, when viewed purely as a tool, it\u2019s only natural that it has both good and bad aspects.<\/p>\n<p>So, use it wisely.<\/p>\n<h2>The next step is to train people who can interpret the data.<\/h2>\n<p>If you're actually going to use it on-site, the real issue isn't the software or the equipment\u2014it's \"who knows how to use it.\"<\/p>\n<p>They\u2019ve handed the entire project over to an outside contractor capable of creating 3D data, and the site supervisor doesn\u2019t understand the details.<\/p>\n<p>At this rate, I probably won't be able to use it all up.<\/p>\n<h3>Can you explain what a heat map is?<\/h3>\n<p>Even if a heat map for as-built inspection appears,<\/p>\n<ul>\n<li>What does this red area mean?<\/li>\n<li>How should we explain this in relation to the standard values?<\/li>\n<li>Can this be used for design changes?<\/li>\n<li>How to Present the Results of the Examination<\/li>\n<\/ul>\n<p>If the people on the ground don't understand this, it'll just end up being a pretty presentation, lol.<\/p>\n<p>I think what\u2019s really important in ICT slope engineering isn\u2019t buying machinery, but ensuring that the people on-site are able to read 3D data.<\/p>\n<p>For those who aren't familiar with this, here's a quick overview:<\/p>\n<ul>\n<li class=\"Z1qcYe\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-hveid=\"CAIIAAgMEAE\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px 0px 12px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><span class=\"T286Pc\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><strong class=\"Yjhzub\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 600; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\">Warm colors (red and orange):<!--TgQPHd|[]--><\/strong> Areas that are higher than the design specification (insufficient material removal)<!--TgQPHd|[]--><\/span><!--TgQPHd|[]--><\/li>\n<li class=\"Z1qcYe\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-hveid=\"CAIIAAgMEAI\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px 0px 12px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><span class=\"T286Pc\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><strong class=\"Yjhzub\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 600; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\">Cool colors (blue and light blue):<!--TgQPHd|[]--><\/strong> Areas that are lower than the design level (over-excavation or under-excavation)<!--TgQPHd|[]--><\/span><!--TgQPHd|[]--><\/li>\n<li class=\"Z1qcYe\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-hveid=\"CAIIAAgMEAM\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px 0px 12px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><span class=\"T286Pc\" data-sfc-cp=\"\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 400; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\"><strong class=\"Yjhzub\" data-sfc-root=\"c\" data-sfc-cb=\"\" data-complete=\"true\" data-copy-service-computed-style=\"font-family: Arial, sans-serif; font-size: 16px; font-weight: 600; margin: 0px; text-decoration: none; border-bottom: 0px rgb(230, 232, 240);\">Green:<!--TgQPHd|[]--><\/strong> Areas that meet the design specifications for height and shape<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-65731\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/69dd1aff382b08851f220c41d28f9e4e.jpg\" alt=\"Future Slope Construction Work\" width=\"600\" height=\"329\" \/><\/p>\n<h2>ICT slope stabilization technology will be a tool that supports future construction sites.<\/h2>\n<p>The Ministry of Land, Infrastructure, Transport and Tourism describes i-Construction as an initiative aimed at improving productivity at construction sites through the use of ICT.<\/p>\n<p>In the construction sector, the declining working-age population has been identified as a challenge, and there is a growing trend toward improving productivity and ensuring safety.<\/p>\n<p>The number of people is decreasing.<\/p>\n<p>Young people don't come in.<\/p>\n<p>But the field work won't go away.<\/p>\n<p>When you think about it that way, ICT slope engineering isn\u2019t something you use just because \u201cit seems convenient\u201d\u2014it\u2019s a tool you should learn to use in order to manage construction sites going forward.<\/p>\n<h3>You don't have to do it perfectly from the start.<\/h3>\n<p>First, let's take a look at the results of the drone survey.<\/p>\n<p>Use the iPhone's LiDAR.<\/p>\n<p>Let's try working with point clouds.<\/p>\n<p>Let's try using a heat map in the client briefing.<\/p>\n<p>Let's compare the as-built photos with the 3D data side by side.<\/p>\n<p>I think that's about right.<\/p>\n<p>These days, government offices are pretty up to date, and the software is quite user-friendly, so it\u2019s easy to do.<\/p>\n<p>&nbsp;<\/p>\n<p>Slope construction work has long been considered dangerous, grueling, and specialized.<\/p>\n<p>That is precisely why we need to use new tools to make the workplace just a little safer, just a little easier to understand, and just a little more welcoming to young people.<\/p>\n<p>ICT slope stabilization isn't magic.<\/p>\n<p>Still, as long as you use it correctly, I think it can be a valuable tool that makes work on-site easier.<\/p>\n<p>CSPI2026 will be held at Makuhari Messe next week.<a href=\"https:\/\/cspi-expo.com\/\" target=\"_blank\" rel=\"noopener\">CSPI2026<\/a><\/p>\n<p>I'm going on the 18th too, so if you see me, say hi lol<\/p>\n<p>Let's explore these new technologies and the latest software, and think about what the future holds!<\/p>\n<p>&nbsp;<\/p>\n<p>See you later.<\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"YAVPYDaaeX\"><p><a href=\"https:\/\/norimen.net\/en\/construction-ict-drones-future\/\">The ICT Wave Shows No Signs of Stopping | Construction ICT and Drone Deployment Map<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cThe ICT Wave Shows No Signs of Stopping | Construction ICT and Drone Deployment Map\u201d \u2014 Shin-Ent\u2019s Slope Management Seminar\" src=\"https:\/\/norimen.net\/construction-ict-drone-future\/embed\/#?secret=NSSfVQhy7Y#?secret=YAVPYDaaeX\" data-secret=\"YAVPYDaaeX\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>","protected":false},"excerpt":{"rendered":"<p>Hello, everyone. This is Enta. In recent years, the construction industry has been flooded with buzzwords like ICT, DX, AI, and 3D data, hasn\u2019t it? To be honest, I think a lot of people working on-site wonder, \u201cCan we really use that on a slope?\u201d Well, the foreman is\u2026<\/p>","protected":false},"author":2,"featured_media":65732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[34,38],"tags":[97,5520,14399,14400],"class_list":["post-65722","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-slope-work","category-construction-management","tag-97","tag-5520","tag-ict","tag-14400"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.4 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e<\/title>\n<meta name=\"description\" content=\"ICT\u6cd5\u9762\u5de5\u306f\u672c\u5f53\u306b\u73fe\u5834\u3067\u4f7f\u3048\u308b\u306e\u304b\u30023\u6b21\u5143\u8d77\u5de5\u6e2c\u91cf\u3001\u8a2d\u8a08\u30c7\u30fc\u30bf\u3001\u51fa\u6765\u5f62\u7ba1\u7406\u3001\u96fb\u5b50\u7d0d\u54c1\u307e\u3067\u3001\u56fd\u4ea4\u7701\u8cc7\u6599\u3092\u78ba\u8a8d\u3057\u306a\u304c\u3089\u73fe\u5834\u611f\u899a\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/norimen.net\/en\/ict-slope-construction-real-world-application\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b\" \/>\n<meta property=\"og:description\" content=\"ICT\u6cd5\u9762\u5de5\u306f\u672c\u5f53\u306b\u73fe\u5834\u3067\u4f7f\u3048\u308b\u306e\u304b\u30023\u6b21\u5143\u8d77\u5de5\u6e2c\u91cf\u3001\u8a2d\u8a08\u30c7\u30fc\u30bf\u3001\u51fa\u6765\u5f62\u7ba1\u7406\u3001\u96fb\u5b50\u7d0d\u54c1\u307e\u3067\u3001\u56fd\u4ea4\u7701\u8cc7\u6599\u3092\u78ba\u8a8d\u3057\u306a\u304c\u3089\u73fe\u5834\u611f\u899a\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/norimen.net\/en\/ict-slope-construction-real-world-application\/\" \/>\n<meta property=\"og:site_name\" content=\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/norimenman\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/norimenman\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-12T23:00:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"329\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u30a8\u30f3\u30bf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@norimenman\" \/>\n<meta name=\"twitter:site\" content=\"@norimenman\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u30a8\u30f3\u30bf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/\"},\"author\":{\"name\":\"\u30a8\u30f3\u30bf\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\"},\"headline\":\"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b\",\"datePublished\":\"2026-06-12T23:00:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/\"},\"wordCount\":35,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/9d7f7c456a0abf91ae0c235b2671aed0.jpg\",\"keywords\":[\"\u51fa\u6765\u5f62\u7ba1\u7406\",\"\u6cd5\u9762\u5de5\u4e8b\",\"ICT\u6cd5\u9762\u5de5\",\"3\u6b21\u5143\u6e2c\u91cf\"],\"articleSection\":[\"\u6cd5\u9762\u5de5\u5168\u822c\",\"\u65bd\u5de5\u7ba1\u7406\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/\",\"url\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/\",\"name\":\"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/9d7f7c456a0abf91ae0c235b2671aed0.jpg\",\"datePublished\":\"2026-06-12T23:00:15+00:00\",\"description\":\"ICT\u6cd5\u9762\u5de5\u306f\u672c\u5f53\u306b\u73fe\u5834\u3067\u4f7f\u3048\u308b\u306e\u304b\u30023\u6b21\u5143\u8d77\u5de5\u6e2c\u91cf\u3001\u8a2d\u8a08\u30c7\u30fc\u30bf\u3001\u51fa\u6765\u5f62\u7ba1\u7406\u3001\u96fb\u5b50\u7d0d\u54c1\u307e\u3067\u3001\u56fd\u4ea4\u7701\u8cc7\u6599\u3092\u78ba\u8a8d\u3057\u306a\u304c\u3089\u73fe\u5834\u611f\u899a\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#primaryimage\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/9d7f7c456a0abf91ae0c235b2671aed0.jpg\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/9d7f7c456a0abf91ae0c235b2671aed0.jpg\",\"width\":600,\"height\":329,\"caption\":\"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u30db\u30fc\u30e0\",\"item\":\"https:\\\/\\\/norimen.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"description\":\"\u6cd5\u9762\u306e\u4e8b\u3092\u672c\u6c17\u3067\u77e5\u308a\u305f\u3044\u3042\u306a\u305f\u3078\uff01\",\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"alternateName\":\"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/norimen.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"alternateName\":\"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/norimenman\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\",\"name\":\"\u30a8\u30f3\u30bf\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"caption\":\"\u30a8\u30f3\u30bf\"},\"description\":\"\u5927\u624b\u6cd5\u9762\u5c02\u9580\u5efa\u8a2d\u4f1a\u793e\u306b\u5c31\u8077\u5f8c\u300132\u6b73\u3067\u72ec\u7acb\u3002 \u3042\u307e\u308a\u306e\u6687\u3055\u306b\u30d6\u30ed\u30b0\u3092\u958b\u8a2d\u3002\u6cd5\u9762\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3001\u3042\u308a\u3068\u3042\u3089\u3086\u308b\u8cea\u554f\u306b\u7b54\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u305d\u306e\u7d50\u679c\u3001\u6cd5\u9762\u696d\u8005\u3001\u5143\u8acb\u696d\u8005\u3001\u305d\u306e\u4ed6\u30bc\u30cd\u30b3\u30f3\u304b\u3089\u306e\u554f\u3044\u5408\u308f\u305b\u3001\u8cea\u554f\u3001\u53d7\u6ce8\u304c\u5897\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u30a2\u30e1\u30d6\u30ed\u3067\u306f\u30bd\u30b3\u30bd\u30b3\u95b2\u89a7\u304c\u5897\u3048\u3001 \u305d\u3053\u3067\u72ec\u81ea\u30c9\u30e1\u30a4\u30f3\u3092\u53d6\u5f97\u3057\u5c11\u3057\u3067\u3082\u5feb\u9069\u306a\u30d6\u30ed\u30b0\u3092\u76ee\u5dee\u3059\u3079\u304f\u3001\u30a2\u30e1\u30d6\u30ed\u304b\u3089\u306e\u5352\u696d\u3092\u6c7a\u3081\u307e\u3057\u305f\u3002 \u4eca\u5f8c\u3082\u3053\u3061\u3089\u3067\u5305\u307f\u96a0\u3055\u305a\u5168\u3066\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3066\u3044\u3053\u3046\u3068\u601d\u3063\u3066\u3044\u307e\u3059\u3002 \u4eca\u5f8c\u3068\u3082\u3088\u308d\u3057\u304f\u304a\u9858\u3044\u7533\u3057\u4e0a\u3052\u307e\u3059\u3002\",\"sameAs\":[\"http:\\\/\\\/enta-d.co.jp\\\/\",\"https:\\\/\\\/www.facebook.com\\\/norimenman\\\/\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\\\/\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/entadnorimenman\"]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/ict-slope-construction-real-site-use\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"width\":220,\"height\":50,\"caption\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Are ICT Slope Construction Methods Really Practical on Site? | Thinking About 3D Surveying and As-Built Management from a Hands-On Perspective - Shin-Ent's Slope Management School","description":"Are ICT slope construction methods truly practical on-site? From 3D pre-construction surveying and design data to as-built management and electronic delivery, I\u2019ll provide an easy-to-understand explanation grounded in real-world experience, while referencing materials from the Ministry of Land, Infrastructure, Transport and Tourism.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/norimen.net\/en\/ict-slope-construction-real-world-application\/","og_locale":"en_US","og_type":"article","og_title":"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b","og_description":"ICT\u6cd5\u9762\u5de5\u306f\u672c\u5f53\u306b\u73fe\u5834\u3067\u4f7f\u3048\u308b\u306e\u304b\u30023\u6b21\u5143\u8d77\u5de5\u6e2c\u91cf\u3001\u8a2d\u8a08\u30c7\u30fc\u30bf\u3001\u51fa\u6765\u5f62\u7ba1\u7406\u3001\u96fb\u5b50\u7d0d\u54c1\u307e\u3067\u3001\u56fd\u4ea4\u7701\u8cc7\u6599\u3092\u78ba\u8a8d\u3057\u306a\u304c\u3089\u73fe\u5834\u611f\u899a\u3067\u5206\u304b\u308a\u3084\u3059\u304f\u89e3\u8aac\u3057\u307e\u3059\u3002","og_url":"https:\/\/norimen.net\/en\/ict-slope-construction-real-world-application\/","og_site_name":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e","article_publisher":"https:\/\/www.facebook.com\/norimenman","article_author":"https:\/\/www.facebook.com\/norimenman\/","article_published_time":"2026-06-12T23:00:15+00:00","og_image":[{"width":600,"height":329,"url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","type":"image\/jpeg"}],"author":"\u30a8\u30f3\u30bf","twitter_card":"summary_large_image","twitter_creator":"@norimenman","twitter_site":"@norimenman","twitter_misc":{"Written by":"\u30a8\u30f3\u30bf","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#article","isPartOf":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/"},"author":{"name":"\u30a8\u30f3\u30bf","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95"},"headline":"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b","datePublished":"2026-06-12T23:00:15+00:00","mainEntityOfPage":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/"},"wordCount":35,"commentCount":0,"publisher":{"@id":"https:\/\/norimen.net\/#organization"},"image":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","keywords":["\u51fa\u6765\u5f62\u7ba1\u7406","\u6cd5\u9762\u5de5\u4e8b","ICT\u6cd5\u9762\u5de5","3\u6b21\u5143\u6e2c\u91cf"],"articleSection":["\u6cd5\u9762\u5de5\u5168\u822c","\u65bd\u5de5\u7ba1\u7406"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/","url":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/","name":"Are ICT Slope Construction Methods Really Practical on Site? | Thinking About 3D Surveying and As-Built Management from a Hands-On Perspective - Shin-Ent's Slope Management School","isPartOf":{"@id":"https:\/\/norimen.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#primaryimage"},"image":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","datePublished":"2026-06-12T23:00:15+00:00","description":"Are ICT slope construction methods truly practical on-site? From 3D pre-construction surveying and design data to as-built management and electronic delivery, I\u2019ll provide an easy-to-understand explanation grounded in real-world experience, while referencing materials from the Ministry of Land, Infrastructure, Transport and Tourism.","breadcrumb":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/norimen.net\/ict-slope-construction-real-site-use\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#primaryimage","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","width":600,"height":329,"caption":"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f"},{"@type":"BreadcrumbList","@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/norimen.net\/"},{"@type":"ListItem","position":2,"name":"ICT\u6cd5\u9762\u5de5\u306f\u73fe\u5834\u3067\u672c\u5f53\u306b\u4f7f\u3048\u308b\u306e\u304b\uff1f\uff5c3\u6b21\u5143\u6e2c\u91cf\u3068\u51fa\u6765\u5f62\u7ba1\u7406\u3092\u73fe\u5834\u611f\u899a\u3067\u8003\u3048\u308b"}]},{"@type":"WebSite","@id":"https:\/\/norimen.net\/#website","url":"https:\/\/norimen.net\/","name":"Shin-Ent's Slope Management Seminar","description":"For those of you who are serious about learning about slopes!","publisher":{"@id":"https:\/\/norimen.net\/#organization"},"alternateName":"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/norimen.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/norimen.net\/#organization","name":"Shin-Ent's Slope Management Seminar","alternateName":"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e","url":"https:\/\/norimen.net\/","logo":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#local-main-organization-logo"},"image":{"@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/norimenman","https:\/\/x.com\/norimenman","https:\/\/www.instagram.com\/enta.d"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95","name":"Entertainment","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","caption":"\u30a8\u30f3\u30bf"},"description":"After joining a major construction company specializing in slope stabilization, I went independent at the age of 32. With so much free time on my hands, I started a blog. I\u2019ve been sharing my expertise on slope stabilization and answering all kinds of questions. As a result, I\u2019ve seen an increase in inquiries, questions, and orders from slope stabilization contractors, general contractors, and other major construction firms. My traffic on Ameblo grew to a reasonable level, so I decided to move on from Ameblo by acquiring my own domain in order to create a more user-friendly blog. I plan to continue sharing all my expertise openly and honestly here. I look forward to your continued support.","sameAs":["http:\/\/enta-d.co.jp\/","https:\/\/www.facebook.com\/norimenman\/","https:\/\/www.instagram.com\/enta.d\/","https:\/\/x.com\/norimenman","https:\/\/www.youtube.com\/c\/entadnorimenman"]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/ict-slope-construction-real-site-use\/#local-main-organization-logo","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","width":220,"height":50,"caption":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e"}]}},"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-09-27 22:21:14","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2026\/06\/9d7f7c456a0abf91ae0c235b2671aed0.jpg","_links":{"self":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/65722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/comments?post=65722"}],"version-history":[{"count":3,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/65722\/revisions"}],"predecessor-version":[{"id":65733,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/65722\/revisions\/65733"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media\/65732"}],"wp:attachment":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media?parent=65722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/categories?post=65722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/tags?post=65722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}