{"id":4282,"date":"2017-08-23T08:00:13","date_gmt":"2017-08-22T23:00:13","guid":{"rendered":"https:\/\/norimen.net\/wordpress\/?p=4282"},"modified":"2026-05-15T20:11:01","modified_gmt":"2026-05-15T11:11:01","slug":"design-changes-and-construction-related-reasons","status":"publish","type":"post","link":"https:\/\/norimen.net\/en\/design-change-construction-reasons\/","title":{"rendered":"When Making Design Changes | Problem Cases Such as Load-Bearing Plates on Uneven Slopes"},"content":{"rendered":"<p>Hello, everyone<\/p>\n<p>This is Enta.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4283\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/d4691cff6c86e6620e7e55f840f4bc35.jpg\" alt=\"\" width=\"600\" height=\"460\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/d4691cff6c86e6620e7e55f840f4bc35.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/d4691cff6c86e6620e7e55f840f4bc35-300x230.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The other evening, there was a tremendous thunderstorm in Aichi Prefecture!<\/p>\n<p>The thunder and clouds were so incredible that I couldn't help but take a picture\u2014it looked like Bahamut was about to appear!!<\/p>\n<p>If you don't know who Bahamut is, you should definitely Google him lol<\/p>\n<hr \/>\n<p>But that's beside the point.<\/p>\n<h3>A \"What on earth is this?\" kind of design<\/h3>\n<p>There are just some designs that are just plain weird, aren't there?<\/p>\n<p>For example,<\/p>\n<p>A pressure plate on an extremely uneven slope.<br \/>\nPlus, it\u2019s designed without a back plate. How are they going to install a load-bearing plate in a spot like this?<\/p>\n<p>&nbsp;<\/p>\n<p>Single-hole drilling in a clearly fractured zone using rock bolts (Site Conditions I)<br \/>\nWouldn't it be impossible without a double pipe??<\/p>\n<p>&nbsp;<\/p>\n<p>The shape of the legal framework is way too weird.<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4284\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/5b1533430d70a5408c068bfaee5c3cf3.jpg\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/5b1533430d70a5408c068bfaee5c3cf3.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/5b1533430d70a5408c068bfaee5c3cf3-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The vertical beams are straight and vertical, but the horizontal beams are slanted at the same angle as the road's grade.<br \/>\nMake them all diamond-shaped from the very beginning.<\/p>\n<p>There are so many situations like this.<\/p>\n<h3>What's the hardest part about making changes?<\/h3>\n<p>Site supervisors need to handle design changes without halting construction, but this can be quite challenging at times.<\/p>\n<p>The most challenging cases are, of course, those involving government officials. I\u2019ll give a rough overview.<\/p>\n<p><span style=\"font-size: 20px;\"><strong>1. The Apathetic Type<\/strong><\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4286\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/df4aa73839016200ef4981d232d7ee59.jpg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/df4aa73839016200ef4981d232d7ee59.jpg 620w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/df4aa73839016200ef4981d232d7ee59-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>This is the hardest part.<\/p>\n<p>Slow to respond, ignores meeting minutes, doesn't keep their boss in the loop\u2014and yet, surprisingly, they have a strong desire for attention.<\/p>\n<p>And I don't understand\u2014or can't understand\u2014why the change is necessary.<\/p>\n<p>Because they\u2019re so focused on keeping costs down, they absolutely fail to see what\u2019s actually necessary for the construction.<\/p>\n<p><span style=\"font-size: 20px;\"><strong>2. The Stubborn Type<\/strong><\/span><\/p>\n<p>This pattern is a bit of a headache, too.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-4287\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/e8822b91c4ab5610efc9983e962729a4.jpg\" alt=\"\" width=\"335\" height=\"373\" \/><\/p>\n<p>It's just no good\u2014for no reason at all. It's just no good. We can't have a constructive conversation.<\/p>\n<p>There are some people who won't be satisfied unless everything is exactly as shown in the blueprints.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 20px;\"><strong>3. Defensive Type<\/strong><\/span><\/p>\n<p>We can communicate well, and they understand me.<\/p>\n<p>However, the process requires an enormous amount of work to prepare materials ranging from previous meeting minutes to the finer details of the agreement.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4288\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/32775b3026a22dad3fd2b921d24b6586.jpg\" alt=\"\" width=\"600\" height=\"460\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/32775b3026a22dad3fd2b921d24b6586.jpg 600w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/32775b3026a22dad3fd2b921d24b6586-300x230.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>For people like this, as long as they prepare the necessary supporting documents, their credibility will improve, so it\u2019s actually the easier option in the end.<\/p>\n<p>There will be quite a lot of paperwork, so it\u2019s moderately challenging. My own defense (theoretical preparation) is flawless.<\/p>\n<p>As a result, people like this tend to rise to positions of authority.<\/p>\n<h3>How to Beat It<\/h3>\n<p>A minimum amount of documentation and supporting evidence is required. However, this alone is not enough to<strong><span style=\"color: #0000ff;\">Mountains don't move.<\/span><\/strong><\/p>\n<p>Past project examples from that area can also be helpful.<\/p>\n<p>Explanations in the drawings regarding how this element works, or justification in the design calculations when changes are made.<\/p>\n<p>In some cases, you may also need cost estimates, quantity calculations, revised drawings, and construction schedules when making changes.<\/p>\n<p>We create all the materials, develop a logical structure, and craft the narrative.<\/p>\n<p>You discuss this with the relevant government official, who will then pass it on to someone with approval authority, such as a section chief.<\/p>\n<p><span style=\"color: #ff0000; font-size: 18px;\"><strong>The story leading up to the design change is extremely important<\/strong><\/span>That's it.<\/p>\n<p>Design changes are impossible without a story.<\/p>\n<p><span style=\"font-size: 20px; color: #ff0000;\"><strong>Everything is consistent and makes sense<\/strong><\/span>That's what matters.<\/p>\n<p>Since that is part of the government agency\u2019s job, it\u2019s important to show a willingness to compromise while understanding that reality.<\/p>\n<h3>If that still doesn't work<\/h3>\n<p>It happens sometimes. There are times when the mountain just won't budge!<\/p>\n<p>There are times when you\u2019re told you absolutely must follow the design specifications.<\/p>\n<p>There's no way around this now.<\/p>\n<p>In that case, please be sure to submit the meeting minutes and discussion records documenting the events leading up to this point.<\/p>\n<p>Ideally, it would be best if they accepted it and stamped it, but some government offices won't accept problematic documents.<\/p>\n<p>It\u2019s common for them to be discarded or have their dates changed.<\/p>\n<p>It is also important to receive written instructions specifying that construction is to be carried out according to those drawings.<\/p>\n<p>If the government agency gave the instruction, we can discuss it during the inspection.<\/p>\n<p><strong><span style=\"color: #0000ff;\">It is difficult to change the names of construction projects, such as those related to disasters or national subsidies.<\/span><\/strong>That's it.<\/p>\n<p>Please be aware that you\u2019ll need to coordinate closely with the government office from the very beginning.<\/p>\n<p>In addition, since it is often necessary to ensure that the amount of the change does not exceed 30 percent, adjustments will be required in that regard as well.<\/p>\n<h3>We may also conduct a trial installation<\/h3>\n<p>In cases where construction is not possible, the only option is to conduct a trial installation.<\/p>\n<p>This is especially true for drilling, for example.<\/p>\n<p>If double-pipe installation is the only option, we will conduct a trial installation using single-pipe drilling.<\/p>\n<p>This will be conducted in the presence of a witness.<\/p>\n<p>Since this is a change made after the fact, it may take a little while.<\/p>\n<h3>The Final Big Move<\/h3>\n<p>Some companies find this useful, while others do not.<\/p>\n<p>It's what's commonly known as the \"OB Strategy.\" That's all!<\/p>\n<p>&nbsp;<\/p>\n<p>See you later, lol<\/p>","protected":false},"excerpt":{"rendered":"<p>Hi everyone, it\u2019s Enta. The other evening, there was an absolutely massive thunderstorm in Aichi Prefecture! The thunder and clouds were so intense that I couldn\u2019t help but take a picture\u2014it looked like Bahamut was about to appear!! If you don\u2019t know who Bahamut is, please Google it lol. Anyway, back to the topic at hand\u2014this design makes you wonder, \u201cWhat on earth is this?\u201d \u2026<\/p>","protected":false},"author":2,"featured_media":4290,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[38],"tags":[596,648,649,650],"class_list":["post-4282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-management","tag-596","tag-648","tag-649","tag-650"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9 - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e<\/title>\n<meta name=\"description\" content=\"\u7269\u51c4\u3044\u4e0d\u9678\u6cd5\u9762\u306b\u53d7\u5727\u677f\u3092\u8a2d\u8a08\u3001\u80cc\u9762\u51e6\u7406\u306e\u306a\u3044\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u8a2d\u8a08\u306a\u3069\u304a\u304b\u3057\u306a\u8a2d\u8a08\u4e8b\u4f8b\u3092\u89e3\u8aac\u3002\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u3079\u304d\u30bf\u30a4\u30df\u30f3\u30b0\u3092\u6cd5\u9762\u5c4b\u304c\u7d39\u4ecb\u3057\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/norimen.net\/en\/design-changes-and-construction-related-reasons\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9\" \/>\n<meta property=\"og:description\" content=\"\u7269\u51c4\u3044\u4e0d\u9678\u6cd5\u9762\u306b\u53d7\u5727\u677f\u3092\u8a2d\u8a08\u3001\u80cc\u9762\u51e6\u7406\u306e\u306a\u3044\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u8a2d\u8a08\u306a\u3069\u304a\u304b\u3057\u306a\u8a2d\u8a08\u4e8b\u4f8b\u3092\u89e3\u8aac\u3002\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u3079\u304d\u30bf\u30a4\u30df\u30f3\u30b0\u3092\u6cd5\u9762\u5c4b\u304c\u7d39\u4ecb\u3057\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/norimen.net\/en\/design-changes-and-construction-related-reasons\/\" \/>\n<meta property=\"og:site_name\" content=\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/norimenman\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/norimenman\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-22T23:00:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-15T11:11:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"460\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"\u30a8\u30f3\u30bf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@norimenman\" \/>\n<meta name=\"twitter:site\" content=\"@norimenman\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u30a8\u30f3\u30bf\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/\"},\"author\":{\"name\":\"\u30a8\u30f3\u30bf\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\"},\"headline\":\"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9\",\"datePublished\":\"2017-08-22T23:00:13+00:00\",\"dateModified\":\"2026-05-15T11:11:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/\"},\"wordCount\":5,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/611f0f30d5eedfba18ef031afee7250b.jpg\",\"keywords\":[\"\u8a2d\u8a08\u5909\u66f4\",\"\u8a66\u9a13\u65bd\u5de5\",\"\u8a2d\u8a08\u5909\u66f4\u306e\u30b3\u30c4\",\"\u30b9\u30c8\u30fc\u30ea\u30fc\"],\"articleSection\":[\"\u65bd\u5de5\u7ba1\u7406\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/\",\"url\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/\",\"name\":\"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9 - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/611f0f30d5eedfba18ef031afee7250b.jpg\",\"datePublished\":\"2017-08-22T23:00:13+00:00\",\"dateModified\":\"2026-05-15T11:11:01+00:00\",\"description\":\"\u7269\u51c4\u3044\u4e0d\u9678\u6cd5\u9762\u306b\u53d7\u5727\u677f\u3092\u8a2d\u8a08\u3001\u80cc\u9762\u51e6\u7406\u306e\u306a\u3044\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u8a2d\u8a08\u306a\u3069\u304a\u304b\u3057\u306a\u8a2d\u8a08\u4e8b\u4f8b\u3092\u89e3\u8aac\u3002\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u3079\u304d\u30bf\u30a4\u30df\u30f3\u30b0\u3092\u6cd5\u9762\u5c4b\u304c\u7d39\u4ecb\u3057\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#primaryimage\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/611f0f30d5eedfba18ef031afee7250b.jpg\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2017\\\/08\\\/611f0f30d5eedfba18ef031afee7250b.jpg\",\"width\":600,\"height\":460,\"caption\":\"\u8a2d\u8a08\u5909\u66f4\u3000\u6cd5\u9762\u5de5\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u30db\u30fc\u30e0\",\"item\":\"https:\\\/\\\/norimen.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"description\":\"\u6cd5\u9762\u306e\u4e8b\u3092\u672c\u6c17\u3067\u77e5\u308a\u305f\u3044\u3042\u306a\u305f\u3078\uff01\",\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"alternateName\":\"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/norimen.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"alternateName\":\"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/norimenman\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\",\"name\":\"\u30a8\u30f3\u30bf\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"caption\":\"\u30a8\u30f3\u30bf\"},\"description\":\"\u5927\u624b\u6cd5\u9762\u5c02\u9580\u5efa\u8a2d\u4f1a\u793e\u306b\u5c31\u8077\u5f8c\u300132\u6b73\u3067\u72ec\u7acb\u3002 \u3042\u307e\u308a\u306e\u6687\u3055\u306b\u30d6\u30ed\u30b0\u3092\u958b\u8a2d\u3002\u6cd5\u9762\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3001\u3042\u308a\u3068\u3042\u3089\u3086\u308b\u8cea\u554f\u306b\u7b54\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u305d\u306e\u7d50\u679c\u3001\u6cd5\u9762\u696d\u8005\u3001\u5143\u8acb\u696d\u8005\u3001\u305d\u306e\u4ed6\u30bc\u30cd\u30b3\u30f3\u304b\u3089\u306e\u554f\u3044\u5408\u308f\u305b\u3001\u8cea\u554f\u3001\u53d7\u6ce8\u304c\u5897\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u30a2\u30e1\u30d6\u30ed\u3067\u306f\u30bd\u30b3\u30bd\u30b3\u95b2\u89a7\u304c\u5897\u3048\u3001 \u305d\u3053\u3067\u72ec\u81ea\u30c9\u30e1\u30a4\u30f3\u3092\u53d6\u5f97\u3057\u5c11\u3057\u3067\u3082\u5feb\u9069\u306a\u30d6\u30ed\u30b0\u3092\u76ee\u5dee\u3059\u3079\u304f\u3001\u30a2\u30e1\u30d6\u30ed\u304b\u3089\u306e\u5352\u696d\u3092\u6c7a\u3081\u307e\u3057\u305f\u3002 \u4eca\u5f8c\u3082\u3053\u3061\u3089\u3067\u5305\u307f\u96a0\u3055\u305a\u5168\u3066\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3066\u3044\u3053\u3046\u3068\u601d\u3063\u3066\u3044\u307e\u3059\u3002 \u4eca\u5f8c\u3068\u3082\u3088\u308d\u3057\u304f\u304a\u9858\u3044\u7533\u3057\u4e0a\u3052\u307e\u3059\u3002\",\"sameAs\":[\"http:\\\/\\\/enta-d.co.jp\\\/\",\"https:\\\/\\\/www.facebook.com\\\/norimenman\\\/\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\\\/\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/entadnorimenman\"]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/design-change-construction-reasons\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"width\":220,\"height\":50,\"caption\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"When Making Design Changes | Problem Cases Such as Support Plates for Uneven Slopes - Shin-Enta's Slope Management School","description":"This article explains examples of unusual design practices, such as designing pressure plates for extremely uneven slopes and rock bolt designs without backfill. A slope engineer explains when design changes should be made.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/norimen.net\/en\/design-changes-and-construction-related-reasons\/","og_locale":"en_US","og_type":"article","og_title":"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9","og_description":"\u7269\u51c4\u3044\u4e0d\u9678\u6cd5\u9762\u306b\u53d7\u5727\u677f\u3092\u8a2d\u8a08\u3001\u80cc\u9762\u51e6\u7406\u306e\u306a\u3044\u30ed\u30c3\u30af\u30dc\u30eb\u30c8\u8a2d\u8a08\u306a\u3069\u304a\u304b\u3057\u306a\u8a2d\u8a08\u4e8b\u4f8b\u3092\u89e3\u8aac\u3002\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u3079\u304d\u30bf\u30a4\u30df\u30f3\u30b0\u3092\u6cd5\u9762\u5c4b\u304c\u7d39\u4ecb\u3057\u307e\u3059\u3002","og_url":"https:\/\/norimen.net\/en\/design-changes-and-construction-related-reasons\/","og_site_name":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e","article_publisher":"https:\/\/www.facebook.com\/norimenman","article_author":"https:\/\/www.facebook.com\/norimenman\/","article_published_time":"2017-08-22T23:00:13+00:00","article_modified_time":"2026-05-15T11:11:01+00:00","og_image":[{"width":600,"height":460,"url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","type":"image\/jpeg"}],"author":"\u30a8\u30f3\u30bf","twitter_card":"summary_large_image","twitter_creator":"@norimenman","twitter_site":"@norimenman","twitter_misc":{"Written by":"\u30a8\u30f3\u30bf"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#article","isPartOf":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/"},"author":{"name":"\u30a8\u30f3\u30bf","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95"},"headline":"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9","datePublished":"2017-08-22T23:00:13+00:00","dateModified":"2026-05-15T11:11:01+00:00","mainEntityOfPage":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/"},"wordCount":5,"commentCount":2,"publisher":{"@id":"https:\/\/norimen.net\/#organization"},"image":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","keywords":["\u8a2d\u8a08\u5909\u66f4","\u8a66\u9a13\u65bd\u5de5","\u8a2d\u8a08\u5909\u66f4\u306e\u30b3\u30c4","\u30b9\u30c8\u30fc\u30ea\u30fc"],"articleSection":["\u65bd\u5de5\u7ba1\u7406"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/norimen.net\/design-change-construction-reasons\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/norimen.net\/design-change-construction-reasons\/","url":"https:\/\/norimen.net\/design-change-construction-reasons\/","name":"When Making Design Changes | Problem Cases Such as Support Plates for Uneven Slopes - Shin-Enta's Slope Management School","isPartOf":{"@id":"https:\/\/norimen.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#primaryimage"},"image":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","datePublished":"2017-08-22T23:00:13+00:00","dateModified":"2026-05-15T11:11:01+00:00","description":"This article explains examples of unusual design practices, such as designing pressure plates for extremely uneven slopes and rock bolt designs without backfill. A slope engineer explains when design changes should be made.","breadcrumb":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/norimen.net\/design-change-construction-reasons\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#primaryimage","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","width":600,"height":460,"caption":"\u8a2d\u8a08\u5909\u66f4\u3000\u6cd5\u9762\u5de5"},{"@type":"BreadcrumbList","@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/norimen.net\/"},{"@type":"ListItem","position":2,"name":"\u8a2d\u8a08\u5909\u66f4\u3092\u884c\u3046\u6642\uff5c\u4e0d\u9678\u6cd5\u9762\u306e\u53d7\u5727\u677f\u306a\u3069\u554f\u984c\u30b1\u30fc\u30b9"}]},{"@type":"WebSite","@id":"https:\/\/norimen.net\/#website","url":"https:\/\/norimen.net\/","name":"Shin-Ent's Slope Management Seminar","description":"For those of you who are serious about learning about slopes!","publisher":{"@id":"https:\/\/norimen.net\/#organization"},"alternateName":"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/norimen.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/norimen.net\/#organization","name":"Shin-Ent's Slope Management Seminar","alternateName":"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e","url":"https:\/\/norimen.net\/","logo":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#local-main-organization-logo"},"image":{"@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/norimenman","https:\/\/x.com\/norimenman","https:\/\/www.instagram.com\/enta.d"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95","name":"Entertainment","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","caption":"\u30a8\u30f3\u30bf"},"description":"After joining a major construction company specializing in slope stabilization, I went independent at the age of 32. With so much free time on my hands, I started a blog. I\u2019ve been sharing my expertise on slope stabilization and answering all kinds of questions. As a result, I\u2019ve seen an increase in inquiries, questions, and orders from slope stabilization contractors, general contractors, and other major construction firms. My traffic on Ameblo grew to a reasonable level, so I decided to move on from Ameblo by acquiring my own domain in order to create a more user-friendly blog. I plan to continue sharing all my expertise openly and honestly here. I look forward to your continued support.","sameAs":["http:\/\/enta-d.co.jp\/","https:\/\/www.facebook.com\/norimenman\/","https:\/\/www.instagram.com\/enta.d\/","https:\/\/x.com\/norimenman","https:\/\/www.youtube.com\/c\/entadnorimenman"]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/design-change-construction-reasons\/#local-main-organization-logo","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","width":220,"height":50,"caption":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e"}]}},"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-08-21 10:16:24","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/08\/611f0f30d5eedfba18ef031afee7250b.jpg","_links":{"self":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/4282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/comments?post=4282"}],"version-history":[{"count":1,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/4282\/revisions"}],"predecessor-version":[{"id":60719,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/4282\/revisions\/60719"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media\/4290"}],"wp:attachment":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media?parent=4282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/categories?post=4282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/tags?post=4282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}