{"id":41424,"date":"2020-03-22T13:57:34","date_gmt":"2020-03-22T04:57:34","guid":{"rendered":"https:\/\/norimen.net\/wordpress\/?p=41424"},"modified":"2026-05-20T02:08:50","modified_gmt":"2026-05-19T17:08:50","slug":"rush-construction-13x-the-cost","status":"publish","type":"post","link":"https:\/\/norimen.net\/en\/rush-construction-13x-cost\/","title":{"rendered":"Rush Projects Cost at Least 1.3 Times as Much as Normal Projects | Cost Analysis"},"content":{"rendered":"<p>Hello, everyone.<\/p>\n<p>This is Enta.<\/p>\n<h2>What Is a Rush Job? | Meaning as Used on Construction Sites<\/h2>\n<p>\"Rush construction\" refers to,<strong>Construction work that pushes forward day and night, including on holidays, significantly shortening the originally required construction period<\/strong>That's what it means. \"Tukkan\" itself is a military term from the Meiji era that means \"to charge into enemy lines,\" so it does have a pretty heroic ring to it, doesn't it? lol<\/p>\n<p>In the construction industry, this provision is invoked under these circumstances.<\/p>\n<ul>\n<li>Cases where the earlier phases (earthwork, foundation work, etc.) are significantly delayed, causing the later phases (slope work, paving, etc.) to fall behind schedule<\/li>\n<li>Cases where the road opening date or facility opening date cannot be changed and must absolutely be met<\/li>\n<li>Cases Where \"Just Get It Done Quickly\" Is the Motto in Disaster Recovery<\/li>\n<\/ul>\n<p>Since we're a slope-construction company, almost every time...<strong>\"The one who has to clean up the mess for the entire project\"<\/strong>That's right. The ripple effects of a three-month delay in earthwork are being felt entirely during the final month of slope stabilization work. That's why, in the slope stabilization industry, rush jobs are moving beyond being just \"common\" and are becoming \"the norm.\"<\/p>\n<p>There's a part of one of our job sites where work is still going on today.<\/p>\n<p>According to my timesheet, I've been working nonstop for the past month.<\/p>\n<p>It's a busy workplace where there's no time to rest.<\/p>\n<p>I really feel terrible for our employees.<\/p>\n<p>Once this job is done, I'll let you take it easy for a bit.<\/p>\n<p>Hang in there until the end of this week!<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5496\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2017\/12\/20010902_1.gif\" alt=\"Thank you in advance.\" width=\"500\" height=\"500\" \/><\/p>\n<p>And while this is a problem at this particular site\u2014or rather, it\u2019s a trend you see at every site\u2014<\/p>\n<p><span style=\"font-size: 150%;\"><strong><span style=\"color: #ff0000;\">In the end, the slope contractors are the ones who have to clean up the mess for every project!<\/span><\/strong><\/span><\/p>\n<p>What's more, when you go to large construction sites run by major general contractors, slope stabilization work is considered ancillary work.<\/p>\n<p>Since it's not part of the main construction work, it's being overlooked.<\/p>\n<p>I\u2019m not sure if they\u2019re simply not taking the delays in the earthwork seriously, but when it comes to our subsequent slope work, we\u2019re put under intense pressure to rush to meet the deadline.<\/p>\n<p>I suppose there are cases where the opening date is fast approaching or the construction deadline is looming.<\/p>\n<p>But surely there were things you could have done earlier?<\/p>\n<p>&nbsp;<\/p>\n<p>It shouldn't be the slope contractor's fault that the project is behind schedule.<\/p>\n<p>It's not a matter of whether or not to include the number of people.<\/p>\n<p>Isn't it because of lax process management?<\/p>\n<p><span style=\"font-size: 150%;\"><strong><span style=\"color: #0000ff;\">Are you managing your processes effectively?<\/span><\/strong><\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-40783\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2019\/12\/22c8a6a71ea550de5b68e0f79512c65c.png\" alt=\"Process\" width=\"600\" height=\"400\" \/><\/p>\n<p>Slope contractors operate according to their own unique project management processes.<\/p>\n<p>It's not right to say things like \"That's too slow\" or \"Add more staff.\" (Well, I suppose some places are slow...)<\/p>\n<p>Even if you increase the number of players, if there are people who just play for fun, it reduces efficiency and ends up costing money unnecessarily.<\/p>\n<p>And at sites like that, it\u2019s usually a vicious cycle where they just keep demanding lower prices, lol.<\/p>\n<p>A while back, at a construction site where I was the construction manager, I told the branch manager of XX Construction, \u201cWe\u2019re cutting corners to meet the deadline, so that\u2019s why it\u2019s so expensive, right?\u201d and he totally lost it lol.<\/p>\n<p>&nbsp;<\/p>\n<p>If it were a site involving only slope work, there might be a way to handle it if the construction schedule is carefully planned, but,<\/p>\n<p>If there are dependencies on other trades, you must ensure that their work is completed first; otherwise, slope work simply cannot be completed.<\/p>\n<p>I want you to understand that the slope contractor bears absolutely no responsibility for the failure to compact the soil.<\/p>\n<p>&nbsp;<\/p>\n<p>And if you absolutely want it packed tightly, it\u2019s definitely going to cost you!<\/p>\n<p>It's obvious at a glance why the same construction work costs more.<\/p>\n<p>Construction companies pay at least 1.35 times the regular wage for overtime work, such as working late, and for work on Sundays.<\/p>\n<p>Since that amount is paid out of the contract price, the construction company is absolutely required to pay its employees.<\/p>\n<p>If it's a job where you know from the start that you'll be working overtime every day and on Sundays,<\/p>\n<p><span style=\"font-size: 150%;\"><strong><span style=\"color: #ff0000;\">A budget of approximately 1.3 times the labor costs<\/span><\/strong><\/span>Please talk about it.<\/p>\n<p><span style=\"font-size: 150%;\"><strong><span style=\"color: #ff0000;\">Machinery costs are approximately 1.1 times the original amount<\/span><\/strong><\/span>I think so. (Machines wear out, too.)<\/p>\n<p>Contractors should also recognize that this approach is standard practice for general contractors.<\/p>\n<p>And it\u2019ll end up putting a strain on other projects, too. Please keep that in mind as well.<\/p>\n<p>If you think that's too expensive, then you'll just have to give up on the construction schedule. (Not that I could ever do that, lol.)<\/p>\n<p>That's how it works.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-41425\" src=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/aZGvLqfv_400x400.jpg\" alt=\"The Dirty Old Man\" width=\"383\" height=\"383\" srcset=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/aZGvLqfv_400x400.jpg 383w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/aZGvLqfv_400x400-300x300.jpg 300w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/aZGvLqfv_400x400-150x150.jpg 150w, https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/aZGvLqfv_400x400-60x60.jpg 60w\" sizes=\"auto, (max-width: 383px) 100vw, 383px\" \/><\/p>\n<p>It\u2019s because there\u2019s a reward that I can work hard and stay motivated.<\/p>\n<p><span style=\"font-size: 130%;\"><strong><span style=\"color: #ff0000;\">\"The payment for this job is super cheap, and,<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: 130%;\"><strong><span style=\"color: #ff0000;\">On top of that, I work two hours of overtime every day and have to work on Sundays\u2014I don't get a single day off.<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: 130%;\"><strong><span style=\"color: #ff0000;\">\"But your pay will stay the same as usual, so do your best! \u2661\"<\/span><\/strong><\/span><\/p>\n<p>No matter how many times people call you a \"cute girl,\" it still gets on your nerves, doesn't it?<\/p>\n<p>If an old guy like me said that, wouldn't you want to quit your job, too?<\/p>\n<p>&nbsp;<\/p>\n<p>It goes without saying that employees who perform construction work should be paid according to how well they do their jobs.<\/p>\n<p>After all, we're doing the kind of rush job that no one wants to do.<\/p>\n<p>And the construction company is, after all, taking on that level of risk and incurring those expenses.<\/p>\n<p><span style=\"font-size: 130%;\"><strong><span style=\"color: #0000ff;\">If we can manage that well for the sake of our mutual goals (interests),<\/span><\/strong><\/span>That's what I think.<\/p>\n<p>&nbsp;<\/p>\n<h2>The Negative Connotation of \"Rush Job\" | Why Is It Used in a Negative Sense?<\/h2>\n<p>Although \u201crush job\u201d is a neutral term in the dictionary, in practice...<strong>99 percent negative connotation<\/strong>It is used in this context. The reason is simple: most rush jobs are the result of \u201cthe fallout from inadequate management of upstream processes.\u201d<\/p>\n<p>For example, a conversation like this.<\/p>\n<ul>\n<li>\"That construction site turned into a rush job...\" \u2192 The reply is, \"Oh, I'm so sorry to hear that.\"<\/li>\n<li>\"We built the house in a rush\" \u2192 Used as a byword for shoddy construction<\/li>\n<li>On social media: \u201cThe release of [XX] was rushed\u201d \u2192 A metaphor for something riddled with bugs, sloppy, and half-baked<\/li>\n<\/ul>\n<p>In other words, the term \u201crush job\u201d itself<strong>\"As a result of prioritizing delivery deadlines over quality, something is being sacrificed.\"<\/strong>It carries a certain nuance. That\u2019s why it\u2019s never written in official documents, and it\u2019s not something we want to say publicly\u2014we don\u2019t want to admit that we \u201crushed through it.\u201d<\/p>\n<p>However, from the perspective of those on the ground, whether or not it will turn into a rush job is<strong>I have a pretty good idea before it starts<\/strong>. If you attend project meetings, you\u2019ll find plenty of sites where things have been looking dicey for the past three months. If someone had taken action at that point, we wouldn\u2019t have ended up in a rush job\u2014but time and again, the opportunity was let slip by. That\u2019s why, on-site, the term \u201crush job\u201d evokes a mix of anger and resignation.<\/p>\n<p>That was kind of a heavy topic for a Sunday, lol.<\/p>\n<p>Since it was right at the very end of the fiscal year, it was a typical kind of story.<\/p>\n<p>If you can take a break, be sure to rest well; if you can\u2019t, you\u2019re probably tired, so please be extra careful!<\/p>\n<p>&nbsp;<\/p>\n<h2>5 Disadvantages of Rush Construction | The Costs a Slope Engineer Has Seen Firsthand on Site<\/h2>\n<p>Aside from the fact that \u201cit costs money,\u201d there are several other drawbacks to rush construction that are evident on-site. Based on my experience as a slope engineer, here are five that I find particularly problematic.<\/p>\n<ol>\n<li><strong>Accident rates are skyrocketing<\/strong>: The combination of accumulated fatigue, stress, and night shifts has led to a sharp increase in human error. In fact, when employees work consecutive days off, the quality of their \"KY\" activities declines, making accidents more likely to occur.<\/li>\n<li><strong>Construction quality declines<\/strong>: We tend to make choices like cutting corners on the curing time for sprayed mortar or not waiting for anchor grout to set\u2014essentially choosing \u201cnot enough time = compromising quality.\u201d This leads to rework later on, which ultimately costs even more time and money.<\/li>\n<li><strong>An employee is quitting<\/strong>: This is the most painful part. Young employees are the first to leave companies that are constantly working under tight deadlines. From a management perspective, the damage caused by losing talent is greater than the financial loss on the front lines.<\/li>\n<li><strong>The machine breaks down<\/strong>: Working on Sundays and running equipment at night takes a toll on the drilling machines, compressors, and spray machines. In my experience, repair costs for machinery skyrocket to two or three times their usual amount right after a rush job is completed.<\/li>\n<li><strong>It causes inconvenience to other work sites<\/strong>\"If we concentrate our personnel and machinery on that site,\" delivery dates at other sites will be delayed. This triggers a chain reaction of rush jobs across multiple sites, creating a vicious cycle that exhausts the entire company.<\/li>\n<\/ol>\n<p>Even with all these drawbacks, we sometimes take on rush jobs anyway. That\u2019s because, in the end,<strong>\"Is it worth the price?\"<\/strong>That\u2019s the bottom line. If we set the budget at 1.3 times the labor costs and 1.1 times the equipment costs\u2014and can actually pay employees their overtime wages\u2014then we can maintain the resolve of the frontline staff.<\/p>\n<p>To put it another way, rush jobs that aren't properly compensated are<strong>You must not take it on<\/strong>That's right. First the employees break down, then the machines, and eventually the company itself collapses. I really think we can't give in on this point.<\/p>\n<p>See you later.<\/p>","protected":false},"excerpt":{"rendered":"<p>Hello, everyone. This is Enta. What Is \u201cTokkan Construction\u201d? | Meaning Used on Construction Sites \u201cTokkan construction\u201d refers to construction work carried out at a breakneck pace, significantly shortening the normally required construction period and proceeding day and night, including on holidays. The term \u201ctokkan\u201d itself originated as military jargon during the Meiji era, meaning \u201cto charge into enemy lines\u201d\u2026<\/p>","protected":false},"author":2,"featured_media":41427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[38,41],"tags":[98,1679,3211,3213,3273,3274],"class_list":["post-41424","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-management","category-schedule","tag-98","tag-1679","tag-3211","tag-3213","tag-3273","tag-3274"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.2 (Yoast SEO v28.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790 - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e<\/title>\n<meta name=\"description\" content=\"\u7a81\u8cab\u5de5\u4e8b\u3068\u306f\u4f55\u304b\u3001\u60aa\u3044\u610f\u5473\u3067\u4f7f\u308f\u308c\u308b\u7406\u7531\u3001\u30c7\u30e1\u30ea\u30c3\u30c85\u3064\u3092\u73fe\u5f79\u306e\u6cd5\u9762\u5c4b\u304c\u73fe\u5834\u76ee\u7dda\u3067\u89e3\u8aac\u3002\u52b4\u52d9\u8cbb1.3\u500d\u30fb\u6a5f\u68b0\u8cbb1.1\u500d\u304c\u5fc5\u8981\u306a\u30b3\u30b9\u30c8\u5206\u6790\u3068\u3001\u793e\u54e1\u3092\u5b88\u308b\u305f\u3081\u306b\u767a\u6ce8\u5074\u306b\u4f1d\u3048\u305f\u3044\u5bfe\u4fa1\u306e\u8003\u3048\u65b9\u3092\u3001\u5e74\u5ea6\u672b\u306e\u73fe\u5834\u306e\u30ea\u30a2\u30eb\u306a\u4f53\u9a13\u8ac7\u3092\u4ea4\u3048\u3066\u544a\u767a\u3057\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/norimen.net\/en\/rush-construction-13x-the-cost\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790\" \/>\n<meta property=\"og:description\" content=\"\u7a81\u8cab\u5de5\u4e8b\u3068\u306f\u4f55\u304b\u3001\u60aa\u3044\u610f\u5473\u3067\u4f7f\u308f\u308c\u308b\u7406\u7531\u3001\u30c7\u30e1\u30ea\u30c3\u30c85\u3064\u3092\u73fe\u5f79\u306e\u6cd5\u9762\u5c4b\u304c\u73fe\u5834\u76ee\u7dda\u3067\u89e3\u8aac\u3002\u52b4\u52d9\u8cbb1.3\u500d\u30fb\u6a5f\u68b0\u8cbb1.1\u500d\u304c\u5fc5\u8981\u306a\u30b3\u30b9\u30c8\u5206\u6790\u3068\u3001\u793e\u54e1\u3092\u5b88\u308b\u305f\u3081\u306b\u767a\u6ce8\u5074\u306b\u4f1d\u3048\u305f\u3044\u5bfe\u4fa1\u306e\u8003\u3048\u65b9\u3092\u3001\u5e74\u5ea6\u672b\u306e\u73fe\u5834\u306e\u30ea\u30a2\u30eb\u306a\u4f53\u9a13\u8ac7\u3092\u4ea4\u3048\u3066\u544a\u767a\u3057\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/norimen.net\/en\/rush-construction-13x-the-cost\/\" \/>\n<meta property=\"og:site_name\" content=\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/norimenman\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/norimenman\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-22T04:57:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-19T17:08:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"\u30a8\u30f3\u30bf\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@norimenman\" \/>\n<meta name=\"twitter:site\" content=\"@norimenman\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\u30a8\u30f3\u30bf\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/\"},\"author\":{\"name\":\"\u30a8\u30f3\u30bf\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\"},\"headline\":\"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790\",\"datePublished\":\"2020-03-22T04:57:34+00:00\",\"dateModified\":\"2026-05-19T17:08:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/\"},\"wordCount\":8,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/0a87f062c5c9725b3411bd1b548eab1e.png\",\"keywords\":[\"\u5de5\u7a0b\u7ba1\u7406\",\"\u5de5\u671f\",\"\u6b8b\u696d\",\"\u65e5\u66dc\u51fa\u52e4\",\"\u6642\u9593\u5916\u52b4\u50cd\",\"\u4ed8\u5e2f\u5de5\u4e8b\"],\"articleSection\":[\"\u65bd\u5de5\u7ba1\u7406\",\"\u5de5\u7a0b\u7ba1\u7406\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/\",\"url\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/\",\"name\":\"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790 - \u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/0a87f062c5c9725b3411bd1b548eab1e.png\",\"datePublished\":\"2020-03-22T04:57:34+00:00\",\"dateModified\":\"2026-05-19T17:08:50+00:00\",\"description\":\"\u7a81\u8cab\u5de5\u4e8b\u3068\u306f\u4f55\u304b\u3001\u60aa\u3044\u610f\u5473\u3067\u4f7f\u308f\u308c\u308b\u7406\u7531\u3001\u30c7\u30e1\u30ea\u30c3\u30c85\u3064\u3092\u73fe\u5f79\u306e\u6cd5\u9762\u5c4b\u304c\u73fe\u5834\u76ee\u7dda\u3067\u89e3\u8aac\u3002\u52b4\u52d9\u8cbb1.3\u500d\u30fb\u6a5f\u68b0\u8cbb1.1\u500d\u304c\u5fc5\u8981\u306a\u30b3\u30b9\u30c8\u5206\u6790\u3068\u3001\u793e\u54e1\u3092\u5b88\u308b\u305f\u3081\u306b\u767a\u6ce8\u5074\u306b\u4f1d\u3048\u305f\u3044\u5bfe\u4fa1\u306e\u8003\u3048\u65b9\u3092\u3001\u5e74\u5ea6\u672b\u306e\u73fe\u5834\u306e\u30ea\u30a2\u30eb\u306a\u4f53\u9a13\u8ac7\u3092\u4ea4\u3048\u3066\u544a\u767a\u3057\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#primaryimage\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/0a87f062c5c9725b3411bd1b548eab1e.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/0a87f062c5c9725b3411bd1b548eab1e.png\",\"width\":600,\"height\":400,\"caption\":\"\u7a81\u8cab\u5de5\u4e8b\u8cbb\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u30db\u30fc\u30e0\",\"item\":\"https:\\\/\\\/norimen.net\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#website\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"description\":\"\u6cd5\u9762\u306e\u4e8b\u3092\u672c\u6c17\u3067\u77e5\u308a\u305f\u3044\u3042\u306a\u305f\u3078\uff01\",\"publisher\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\"},\"alternateName\":\"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/norimen.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/norimen.net\\\/#organization\",\"name\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\",\"alternateName\":\"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e\",\"url\":\"https:\\\/\\\/norimen.net\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/norimenman\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\"],\"telephone\":[],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/norimen.net\\\/#\\\/schema\\\/person\\\/7e507d48b040ed0f7a88ef4625070b95\",\"name\":\"\u30a8\u30f3\u30bf\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g\",\"caption\":\"\u30a8\u30f3\u30bf\"},\"description\":\"\u5927\u624b\u6cd5\u9762\u5c02\u9580\u5efa\u8a2d\u4f1a\u793e\u306b\u5c31\u8077\u5f8c\u300132\u6b73\u3067\u72ec\u7acb\u3002 \u3042\u307e\u308a\u306e\u6687\u3055\u306b\u30d6\u30ed\u30b0\u3092\u958b\u8a2d\u3002\u6cd5\u9762\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3001\u3042\u308a\u3068\u3042\u3089\u3086\u308b\u8cea\u554f\u306b\u7b54\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u305d\u306e\u7d50\u679c\u3001\u6cd5\u9762\u696d\u8005\u3001\u5143\u8acb\u696d\u8005\u3001\u305d\u306e\u4ed6\u30bc\u30cd\u30b3\u30f3\u304b\u3089\u306e\u554f\u3044\u5408\u308f\u305b\u3001\u8cea\u554f\u3001\u53d7\u6ce8\u304c\u5897\u3048\u3066\u304d\u307e\u3057\u305f\u3002 \u30a2\u30e1\u30d6\u30ed\u3067\u306f\u30bd\u30b3\u30bd\u30b3\u95b2\u89a7\u304c\u5897\u3048\u3001 \u305d\u3053\u3067\u72ec\u81ea\u30c9\u30e1\u30a4\u30f3\u3092\u53d6\u5f97\u3057\u5c11\u3057\u3067\u3082\u5feb\u9069\u306a\u30d6\u30ed\u30b0\u3092\u76ee\u5dee\u3059\u3079\u304f\u3001\u30a2\u30e1\u30d6\u30ed\u304b\u3089\u306e\u5352\u696d\u3092\u6c7a\u3081\u307e\u3057\u305f\u3002 \u4eca\u5f8c\u3082\u3053\u3061\u3089\u3067\u5305\u307f\u96a0\u3055\u305a\u5168\u3066\u306e\u30ce\u30a6\u30cf\u30a6\u3092\u516c\u958b\u3057\u3066\u3044\u3053\u3046\u3068\u601d\u3063\u3066\u3044\u307e\u3059\u3002 \u4eca\u5f8c\u3068\u3082\u3088\u308d\u3057\u304f\u304a\u9858\u3044\u7533\u3057\u4e0a\u3052\u307e\u3059\u3002\",\"sameAs\":[\"http:\\\/\\\/enta-d.co.jp\\\/\",\"https:\\\/\\\/www.facebook.com\\\/norimenman\\\/\",\"https:\\\/\\\/www.instagram.com\\\/enta.d\\\/\",\"https:\\\/\\\/x.com\\\/norimenman\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/entadnorimenman\"]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/norimen.net\\\/rush-construction-13x-cost\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"contentUrl\":\"https:\\\/\\\/norimen.net\\\/wordpress\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/site_title_logo.png\",\"width\":220,\"height\":50,\"caption\":\"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rush Construction Costs 1.3 Times More Than Usual | Cost Analysis - Shin-Ent's Slope Management School","description":"A practicing slope engineer explains what \u201crush construction\u201d is, why it\u2019s used in a negative sense, and its five drawbacks from a hands-on perspective. Drawing on real-life experiences from end-of-fiscal-year job sites, he exposes the cost analysis\u2014which shows that labor costs are 1.3 times higher and equipment costs are 1.1 times higher\u2014and shares the compensation philosophy he wants to convey to clients to protect his employees.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/norimen.net\/en\/rush-construction-13x-the-cost\/","og_locale":"en_US","og_type":"article","og_title":"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790","og_description":"\u7a81\u8cab\u5de5\u4e8b\u3068\u306f\u4f55\u304b\u3001\u60aa\u3044\u610f\u5473\u3067\u4f7f\u308f\u308c\u308b\u7406\u7531\u3001\u30c7\u30e1\u30ea\u30c3\u30c85\u3064\u3092\u73fe\u5f79\u306e\u6cd5\u9762\u5c4b\u304c\u73fe\u5834\u76ee\u7dda\u3067\u89e3\u8aac\u3002\u52b4\u52d9\u8cbb1.3\u500d\u30fb\u6a5f\u68b0\u8cbb1.1\u500d\u304c\u5fc5\u8981\u306a\u30b3\u30b9\u30c8\u5206\u6790\u3068\u3001\u793e\u54e1\u3092\u5b88\u308b\u305f\u3081\u306b\u767a\u6ce8\u5074\u306b\u4f1d\u3048\u305f\u3044\u5bfe\u4fa1\u306e\u8003\u3048\u65b9\u3092\u3001\u5e74\u5ea6\u672b\u306e\u73fe\u5834\u306e\u30ea\u30a2\u30eb\u306a\u4f53\u9a13\u8ac7\u3092\u4ea4\u3048\u3066\u544a\u767a\u3057\u307e\u3059\u3002","og_url":"https:\/\/norimen.net\/en\/rush-construction-13x-the-cost\/","og_site_name":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e","article_publisher":"https:\/\/www.facebook.com\/norimenman","article_author":"https:\/\/www.facebook.com\/norimenman\/","article_published_time":"2020-03-22T04:57:34+00:00","article_modified_time":"2026-05-19T17:08:50+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","type":"image\/png"}],"author":"\u30a8\u30f3\u30bf","twitter_card":"summary_large_image","twitter_creator":"@norimenman","twitter_site":"@norimenman","twitter_misc":{"Written by":"\u30a8\u30f3\u30bf","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#article","isPartOf":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/"},"author":{"name":"\u30a8\u30f3\u30bf","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95"},"headline":"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790","datePublished":"2020-03-22T04:57:34+00:00","dateModified":"2026-05-19T17:08:50+00:00","mainEntityOfPage":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/"},"wordCount":8,"commentCount":0,"publisher":{"@id":"https:\/\/norimen.net\/#organization"},"image":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","keywords":["\u5de5\u7a0b\u7ba1\u7406","\u5de5\u671f","\u6b8b\u696d","\u65e5\u66dc\u51fa\u52e4","\u6642\u9593\u5916\u52b4\u50cd","\u4ed8\u5e2f\u5de5\u4e8b"],"articleSection":["\u65bd\u5de5\u7ba1\u7406","\u5de5\u7a0b\u7ba1\u7406"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/norimen.net\/rush-construction-13x-cost\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/","url":"https:\/\/norimen.net\/rush-construction-13x-cost\/","name":"Rush Construction Costs 1.3 Times More Than Usual | Cost Analysis - Shin-Ent's Slope Management School","isPartOf":{"@id":"https:\/\/norimen.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#primaryimage"},"image":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#primaryimage"},"thumbnailUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","datePublished":"2020-03-22T04:57:34+00:00","dateModified":"2026-05-19T17:08:50+00:00","description":"A practicing slope engineer explains what \u201crush construction\u201d is, why it\u2019s used in a negative sense, and its five drawbacks from a hands-on perspective. Drawing on real-life experiences from end-of-fiscal-year job sites, he exposes the cost analysis\u2014which shows that labor costs are 1.3 times higher and equipment costs are 1.1 times higher\u2014and shares the compensation philosophy he wants to convey to clients to protect his employees.","breadcrumb":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/norimen.net\/rush-construction-13x-cost\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#primaryimage","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","width":600,"height":400,"caption":"\u7a81\u8cab\u5de5\u4e8b\u8cbb"},{"@type":"BreadcrumbList","@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u30db\u30fc\u30e0","item":"https:\/\/norimen.net\/"},{"@type":"ListItem","position":2,"name":"\u7a81\u8cab\u5de5\u4e8b\u306f\u901a\u5e38\u306e1.3\u500d\u4ee5\u4e0a\u304a\u91d1\u304c\u304b\u304b\u308b\uff5c\u30b3\u30b9\u30c8\u5206\u6790"}]},{"@type":"WebSite","@id":"https:\/\/norimen.net\/#website","url":"https:\/\/norimen.net\/","name":"Shin-Ent's Slope Management Seminar","description":"For those of you who are serious about learning about slopes!","publisher":{"@id":"https:\/\/norimen.net\/#organization"},"alternateName":"\u30a8\u30f3\u30bf\u306e\u30ce\u30ea\u30e1\u30f3","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/norimen.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/norimen.net\/#organization","name":"Shin-Ent's Slope Management Seminar","alternateName":"\u5869\u7530\u958b\u767a\u682a\u5f0f\u4f1a\u793e","url":"https:\/\/norimen.net\/","logo":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#local-main-organization-logo"},"image":{"@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/norimenman","https:\/\/x.com\/norimenman","https:\/\/www.instagram.com\/enta.d"],"telephone":[],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/norimen.net\/#\/schema\/person\/7e507d48b040ed0f7a88ef4625070b95","name":"Entertainment","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7b9657262458e754e6e51a10396868dafe6afa60d649dffcd4d52a5fc01aaa7d?s=96&d=monsterid&r=g","caption":"\u30a8\u30f3\u30bf"},"description":"After joining a major construction company specializing in slope stabilization, I went independent at the age of 32. With so much free time on my hands, I started a blog. I\u2019ve been sharing my expertise on slope stabilization and answering all kinds of questions. As a result, I\u2019ve seen an increase in inquiries, questions, and orders from slope stabilization contractors, general contractors, and other major construction firms. My traffic on Ameblo grew to a reasonable level, so I decided to move on from Ameblo by acquiring my own domain in order to create a more user-friendly blog. I plan to continue sharing all my expertise openly and honestly here. I look forward to your continued support.","sameAs":["http:\/\/enta-d.co.jp\/","https:\/\/www.facebook.com\/norimenman\/","https:\/\/www.instagram.com\/enta.d\/","https:\/\/x.com\/norimenman","https:\/\/www.youtube.com\/c\/entadnorimenman"]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/norimen.net\/rush-construction-13x-cost\/#local-main-organization-logo","url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","contentUrl":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2016\/10\/site_title_logo.png","width":220,"height":50,"caption":"\u65b0\u30a8\u30f3\u30bf\u306e\u6cd5\u9762\u7ba1\u7406\u587e"}]}},"jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"publishpress_future_action":{"enabled":false,"date":"2026-08-20 10:15:16","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"jetpack_featured_media_url":"https:\/\/norimen.net\/wordpress\/wp-content\/uploads\/2020\/03\/0a87f062c5c9725b3411bd1b548eab1e.png","_links":{"self":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/41424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/comments?post=41424"}],"version-history":[{"count":3,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/41424\/revisions"}],"predecessor-version":[{"id":64482,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/posts\/41424\/revisions\/64482"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media\/41427"}],"wp:attachment":[{"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/media?parent=41424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/categories?post=41424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/norimen.net\/en\/wp-json\/wp\/v2\/tags?post=41424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}